X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101608000

Well Details

Well ID: 0394101608000
Loading map...
Location: 00/08-16-039-10W4/0
Location Alias: 00/08-16-39-10 W4M
Location Alias 2: 00/08-16-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 16
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 8-16-39-10
Operator Name: Cleo Energy Corp.
License Number: 0140829
License Date: 1989-09-05
License Status: Issued
Spud Date: 1989-09-05
Final Drill Date: 1989-09-09
Well Total Depth: 1022.00 m
Surface Hole Latitude: 52.350651
Surface Hole Longitude: -111.373101

For data sources see[1][2]

Well History

Date Event
1989-09-05 Obtained License
1989-09-06 Surface Casing Operation Performed
1989-09-09 Finished Drilling
1989-09-09 Well Log Performed
1989-09-09 Well Mode changed to Drilled and Cased
1989-09-10 Production Casing Operation Performed
1989-09-10 Rig Released
1989-09-17 Perforation Treatment Performed - Jet Perforation
1989-09-17 Well Log Performed
1989-10-01 Well Began Production
1989-10-01 Well Fluid changed to Crude Oil
1989-10-01 Well Mode changed to Pumping
1989-11-07 Perforation Treatment Performed - Jet Perforation
1989-11-07 Well Log Performed
1989-11-24 Well Log Performed
1998-09-16 Perforation Treatment Performed - Cement Squeeze
1998-09-16 Well Log Performed
1999-09-08 Well Log Performed
1999-09-09 Perforation Treatment Performed - Jet Perforation
1999-09-09 Well Log Performed
1999-09-10 Perforation Treatment Performed - Cement Squeeze
1999-09-10 Plug Back Performed
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2000-09-15 Well Began Injection
2000-09-15 Well Fluid changed to Water
2000-09-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-09-17 Perforation 960.50 961.50 13
1989-11-07 Perforation 958.30 959.30 13
1998-09-16 Cement Squeeze 958.30 959.30 0
1999-09-09 Perforation 340.00 348.00 17
1999-09-10 Cement Squeeze 340.00 348.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1979 0.0 0.0 0.0
1990 2206 0.0 0.0 0.0
1991 8729 0.0 0.0 0.0
1992 8666 0.0 0.0 0.0
1993 8362 0.0 0.0 0.0
1994 8075 0.0 0.0 0.0
1995 8391 0.0 0.0 0.0
1996 8692 0.0 0.0 0.0
1997 1823 0.0 0.0 0.0
1998 1359 0.0 0.0 0.0
1999 3955 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References