X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101414C02

Well Details

Well ID: 0394101414C02
Loading map...
Location: C0/14-14-039-10W4/2
Location Alias: C0/14-14-39-10 W4M
Location Alias 2: C0/14-14-039-10 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: CLEO ENERGY PROVOST 13-14-39-10
Operator Name: Cleo Energy Corp.
License Number: 0143730
License Date: 1990-03-14
License Status: Amended
Spud Date: 1990-04-25
Final Drill Date: 1990-04-27
Well Total Depth: 1032.00 m
Surface Hole Latitude: 52.361844
Surface Hole Longitude: -111.343837

For data sources see[1][2]

Well History

Date Event
1990-03-14 Obtained License
1990-04-25 Direction Drilling Operation Performed - Deviate
1990-04-27 Finished Drilling
1990-04-27 Well Log Performed
1990-04-27 Well Mode changed to Drilled and Cased
1990-04-28 Production Casing Operation Performed
1990-04-28 Rig Released
1990-04-30 Well Log Performed
1990-05-01 Well Log Performed
1990-05-08 Perforation Treatment Performed - Jet Perforation
1990-05-08 Well Log Performed
1990-05-15 Well Began Production
1990-05-15 Well Fluid changed to Crude Oil
1990-05-15 Well Mode changed to Pumping
1999-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-27 Plug Back Performed
1999-10-27 Well Fluid changed to Crude Oil
1999-10-27 Well Mode changed to Abandoned Zone
2014-11-08 Perforation Treatment Performed - Jet Perforation
2015-04-22 Perforation Treatment Performed - Jet Perforation
2015-04-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
2015-10-05 Well Began Injection
2015-10-05 Well Fluid changed to Water
2015-10-05 Well Type changed to Disposal
2017-03-12 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-04-25 152.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-05-08 Perforation 989.70 993.00 13
1999-10-27 Packing Device Capped w/Cement 977.00 985.00 0
2014-11-08 Perforation 989.70 993.00 13
2015-04-22 Perforation 1004.00 1010.00 13
2015-04-23 Casing Patch 989.70 993.00 0
2017-03-12 Perforation 1004.00 1010.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 5346 0.0 0.0 0.0
1991 8619 0.0 0.0 0.0
1992 8642 0.0 0.0 0.0
1993 8617 0.0 0.0 0.0
1994 8595 0.0 0.0 0.0
1995 8332 0.0 0.0 0.0
1996 8436 0.0 0.0 0.0
1997 8542 0.0 0.0 0.0
1998 8690 0.0 0.0 0.0
1999 3948 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-10 No Incident Encountered 0.00 0.00
2015-04-24 No Incident Encountered 0.00 0.00
2017-03-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References