X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394101306000

Well Details

Well ID: 0394101306000
Loading map...
Location: 00/06-13-039-10W4/0
Location Alias: 00/06-13-39-10 W4M
Location Alias 2: 00/06-13-039-10 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 10
Section: 13
County/Municipality: County of Paintearth No. 18
Well Name: BOW RIVER PROVOST 6-13-39-10
Operator Name: Bow River Energy Ltd.
License Number: 0073034
License Date: 1978-11-17
License Status: Abandoned
Spud Date: 1978-11-27
Final Drill Date: 1978-12-03
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.353529
Surface Hole Longitude: -111.317146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-17 Obtained License
1978-11-30 Drill Stem Test Performed
1978-12-03 Finished Drilling
1978-12-04 Drill Stem Test Performed
1978-12-05 Drill Stem Test Performed
1978-12-06 Production Casing Operation Performed
1978-12-15 Perforation Treatment Performed - Jet Perforation
1978-12-15 Well Mode changed to Drilled and Cased
1981-12-09 Well Began Production
1981-12-09 Well Fluid changed to Gas
1981-12-09 Well Mode changed to Flowing
2015-06-01 Well Fluid changed to Gas
2015-06-01 Well Mode changed to Suspended
2016-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-03 Perforation Treatment Performed - Jet Perforation
2016-03-03 Plug Back Performed
2016-03-03 Well Fluid changed to Gas
2016-03-03 Well Mode changed to Abandoned Zone
2016-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-04 Perforation Treatment Performed - Remedial Casing
2016-03-04 Plug Back Performed
2016-03-07 Well Abandoned
2016-03-07 Well Fluid changed to Gas
2016-03-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-15 Perforation 817.30 820.00 10
2016-03-03 Packing Device Capped w/Cement 807.00 815.00 0
2016-03-03 Perforation 338.00 340.00 13
2016-03-04 Remedial Casing Cementing 338.00 340.00 0
2016-03-04 Packing Device Capped w/Cement 318.00 334.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 580 0.0 0.0 0.0
1982 2508 0.0 0.0 0.0
1983 2543 0.0 0.0 0.0
1984 3617 0.0 0.0 0.0
1985 5246 0.0 0.0 0.0
1986 3210 0.0 0.0 0.0
1987 4122 0.0 0.0 0.0
1988 7913 0.0 0.0 0.0
1989 4421 0.0 0.0 0.0
1990 6364 0.0 0.0 0.0
1991 7018 0.0 0.0 0.0
1992 5109 0.0 0.0 0.0
1993 6531 0.0 0.0 0.0
1994 7595 0.0 0.0 0.0
1995 7708 0.0 0.0 0.0
1996 7842 0.0 0.0 0.0
1997 7841 0.0 0.0 0.0
1998 8313 0.0 0.0 0.0
1999 8241 0.0 0.0 0.0
2000 7091 0.0 0.0 0.0
2001 7660 0.0 0.0 0.0
2002 8211 0.0 0.0 0.0
2003 6277 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8649 0.0 0.0 0.0
2009 4729 0.0 0.0 0.0
2010 3943 0.0 0.0 0.0
2011 3681 0.0 0.0 0.0
2012 4752 0.0 0.0 0.0
2013 3721 0.0 0.0 0.0
2014 1515 0.0 0.0 0.0
2015 3096 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References