If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394081102002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.334807,"lon":-111.046109,"icon":""}]} |
Location: 00/02-11-039-08W4/2 | |
Location Alias: 00/02-11-39-08 W4M | |
Location Alias 2: 00/02-11-039-08 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 08 | |
Section: 11 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CLEO ENERGY PROVOST 2-11-39-8 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0138276 | |
License Date: 1989-01-17 | |
License Status: Suspension | |
Spud Date: 1989-01-17 | |
Final Drill Date: 1989-01-21 | |
Well Total Depth: 1000.00 m | |
Surface Hole Latitude: 52.334807 | |
Surface Hole Longitude: -111.046109 |
Date | Event |
---|---|
1989-01-17 | Obtained License |
1989-01-18 | Surface Casing Operation Performed |
1989-01-21 | Finished Drilling |
1989-01-21 | Well Log Performed |
1989-01-21 | Well Mode changed to Drilled and Cased |
1989-01-22 | Drill Stem Test Performed |
1989-01-24 | Production Casing Operation Performed |
1989-01-24 | Rig Released |
1989-02-07 | Well Log Performed |
1989-02-09 | Perforation Treatment Performed - Jet Perforation |
1989-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-15 | Perforation Treatment Performed - Jet Perforation |
1989-03-15 | Well Log Performed |
1990-10-24 | Perforation Treatment Performed - Fractured |
1996-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-24 | Plug Back Performed |
1996-03-24 | Well Log Performed |
1996-03-25 | Perforation Treatment Performed - Jet Perforation |
1996-04-01 | Well Began Production |
1996-04-01 | Well Fluid changed to Gas |
1996-04-01 | Well Mode changed to Flowing |
2000-03-01 | Well Fluid changed to Gas |
2000-03-01 | Well Mode changed to Suspended |
2000-04-28 | Perforation Treatment Performed - Cement Squeeze |
2000-05-01 | Perforation Treatment Performed - Jet Perforation |
2000-05-01 | Well Fluid changed to Gas |
2000-05-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-02-09 | Perforation | 899.00 | 903.00 | 7 |
1989-02-11 | Acid Treatment | 899.00 | 903.00 | 0 |
1989-03-15 | Perforation | 903.00 | 905.50 | 13 |
1990-10-24 | Fracture | 899.00 | 905.50 | 0 |
1996-03-24 | Packing Device Capped w/Cement | 887.00 | 895.00 | 0 |
1996-03-25 | Perforation | 812.50 | 814.50 | 13 |
2000-04-28 | Cement Squeeze | 812.50 | 814.50 | 0 |
2000-05-01 | Perforation | 899.00 | 903.00 | 7 |
2000-05-01 | Perforation | 903.00 | 905.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 6415 | 0.0 | 0.0 | 0.0 |
1997 | 8244 | 0.0 | 0.0 | 0.0 |
1998 | 8757 | 0.0 | 0.0 | 0.0 |
1999 | 8024 | 0.0 | 0.0 | 0.0 |
2000 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]