X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394081102002

Well Details

Well ID: 0394081102002
Loading map...
Location: 00/02-11-039-08W4/2
Location Alias: 00/02-11-39-08 W4M
Location Alias 2: 00/02-11-039-08 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 08
Section: 11
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 2-11-39-8
Operator Name: Cleo Energy Corp.
License Number: 0138276
License Date: 1989-01-17
License Status: Suspension
Spud Date: 1989-01-17
Final Drill Date: 1989-01-21
Well Total Depth: 1000.00 m
Surface Hole Latitude: 52.334807
Surface Hole Longitude: -111.046109

For data sources see[1][2]

Well History

Date Event
1989-01-17 Obtained License
1989-01-18 Surface Casing Operation Performed
1989-01-21 Finished Drilling
1989-01-21 Well Log Performed
1989-01-21 Well Mode changed to Drilled and Cased
1989-01-22 Drill Stem Test Performed
1989-01-24 Production Casing Operation Performed
1989-01-24 Rig Released
1989-02-07 Well Log Performed
1989-02-09 Perforation Treatment Performed - Jet Perforation
1989-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-15 Perforation Treatment Performed - Jet Perforation
1989-03-15 Well Log Performed
1990-10-24 Perforation Treatment Performed - Fractured
1996-03-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-24 Plug Back Performed
1996-03-24 Well Log Performed
1996-03-25 Perforation Treatment Performed - Jet Perforation
1996-04-01 Well Began Production
1996-04-01 Well Fluid changed to Gas
1996-04-01 Well Mode changed to Flowing
2000-03-01 Well Fluid changed to Gas
2000-03-01 Well Mode changed to Suspended
2000-04-28 Perforation Treatment Performed - Cement Squeeze
2000-05-01 Perforation Treatment Performed - Jet Perforation
2000-05-01 Well Fluid changed to Gas
2000-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-09 Perforation 899.00 903.00 7
1989-02-11 Acid Treatment 899.00 903.00 0
1989-03-15 Perforation 903.00 905.50 13
1990-10-24 Fracture 899.00 905.50 0
1996-03-24 Packing Device Capped w/Cement 887.00 895.00 0
1996-03-25 Perforation 812.50 814.50 13
2000-04-28 Cement Squeeze 812.50 814.50 0
2000-05-01 Perforation 899.00 903.00 7
2000-05-01 Perforation 903.00 905.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6415 0.0 0.0 0.0
1997 8244 0.0 0.0 0.0
1998 8757 0.0 0.0 0.0
1999 8024 0.0 0.0 0.0
2000 1416 0.0 0.0 0.0

For data sources see[5]

References