X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394080510000

Well Details

Well ID: 0394080510000
Loading map...
Location: 00/10-05-039-08W4/0
Location Alias: 00/10-05-39-08 W4M
Location Alias 2: 00/10-05-039-08 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 08
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: ACL PROVOST 10-5-39-8
Operator Name: Battle River Energy Ltd.
License Number: 0013839
License Date: 1957-08-15
License Status: Issued
Spud Date: 1957-08-17
Final Drill Date: 1957-08-30
Well Total Depth: 1036.30 m
Surface Hole Latitude: 52.326720
Surface Hole Longitude: -111.117520

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-08-15 Obtained License
1957-08-21 Drill Stem Test Performed
1957-08-24 Drill Stem Test Performed
1957-08-25 Drill Stem Test Performed
1957-08-26 Drill Stem Test Performed
1957-08-30 Drill Stem Test Performed
1957-08-30 Finished Drilling
1957-09-01 Production Casing Operation Performed
1957-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-09-10 Perforation Treatment Performed - Bullet Perforation
1957-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-09-12 Perforation Treatment Performed - Fractured
1957-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-02-08 Perforation Treatment Performed - Jet Perforation
1958-10-10 Well Mode changed to Drilled and Cased
1962-03-13 Well Began Production
1962-03-13 Well Fluid changed to Gas
1962-03-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-09-10 Bullet Perforation 911.40 915.90 13
1957-09-10 Acid Treatment 911.40 915.90 0
1957-09-12 Acid Treatment 911.40 915.90 0
1957-09-12 Fracture 911.40 915.90 0
1957-09-14 Packing Device Capped w/Cement 880.30 916.80 0
1958-02-08 Perforation 767.50 769.00 26
1958-02-08 Perforation 770.50 771.10 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8735 0.0 0.0 0.0
1970 8759 0.0 0.0 0.0
1971 8759 0.0 0.0 0.0
1972 8111 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 7895 0.0 0.0 0.0
1975 8423 0.0 0.0 0.0
1976 8783 0.0 0.0 0.0
1977 7631 0.0 0.0 0.0
1978 5615 0.0 0.0 0.0
1979 5975 0.0 0.0 0.0
1980 5016 0.0 0.0 0.0
1981 3757 0.0 0.0 0.0
1982 7188 0.0 0.0 0.0
1983 5656 0.0 0.0 0.0
1984 5008 0.0 0.0 0.0
1985 5484 0.0 0.0 0.0
1986 6705 0.0 0.0 0.0
1987 6649 0.0 0.0 0.0
1988 6492 0.0 0.0 0.0
1989 8133 0.0 0.0 0.0
1990 8206 0.0 0.0 0.0
1991 8664 0.0 0.0 0.0
1992 8596 0.0 0.0 0.0
1993 8664 0.0 0.0 0.0
1994 8164 0.0 0.0 0.0
1995 8151 0.0 0.0 0.0
1996 8258 0.0 0.0 0.0
1997 8383 0.0 0.0 0.0
1998 8053 0.0 0.0 0.0
1999 8324 0.0 0.0 0.0
2000 8240 0.0 0.0 0.0
2001 8566 0.0 0.0 0.0
2002 8571 0.0 0.0 0.0
2003 8618 0.0 0.0 0.0
2004 8725 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8752 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 7583 0.0 0.0 0.0
2010 7738 0.0 0.0 0.0
2011 6072 0.0 0.0 0.0
2012 8650 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 8630 0.0 0.0 0.0
2016 8749 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 6552 0.0 0.0 0.0
2019 8063 0.0 0.0 0.0
2020 1871 0.0 0.0 0.0

For data sources see[5]

References