X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394080216000

Well Details

Well ID: 0394080216000
Loading map...
Location: 00/16-02-039-08W4/0
Location Alias: 00/16-02-39-08 W4M
Location Alias 2: 00/16-02-039-08 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 08
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 16-2-39-8
Operator Name: Cleo Energy Corp.
License Number: 0196696
License Date: 1997-01-14
License Status: Suspension
Spud Date: 1997-02-26
Final Drill Date: 1997-02-28
Well Total Depth: 961.00 m
Surface Hole Latitude: 52.331718
Surface Hole Longitude: -111.038083

For data sources see[1][2]

Well History

Date Event
1997-01-14 Obtained License
1997-02-26 Well Log Performed
1997-02-27 Surface Casing Operation Performed
1997-02-28 Finished Drilling
1997-02-28 Well Mode changed to Drilled and Cased
1997-03-01 Production Casing Operation Performed
1997-03-01 Well Log Performed
1997-03-02 Rig Released
1997-05-07 Perforation Treatment Performed - Jet Perforation
1997-05-07 Well Log Performed
1997-07-18 Well Began Production
1997-07-18 Well Fluid changed to Water
1997-07-18 Well Type changed to Source
1997-09-13 Perforation Treatment Performed - Jet Perforation
1997-09-13 Well Log Performed
1997-09-15 Perforation Treatment Performed - Jet Perforation
1997-09-19 Well Log Performed
1997-09-30 Well Fluid changed to Water
1997-09-30 Well Type changed to Source
2002-07-31 Well Fluid changed to Water
2002-07-31 Well Mode changed to Suspended
2002-07-31 Well Type changed to Source
2019-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-28 Plug Back Performed
2019-03-28 Well Fluid changed to Water
2019-03-28 Well Mode changed to Abandoned Zone
2019-03-28 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-07 Perforation 931.00 933.00 13
1997-05-07 Perforation 934.00 940.50 13
1997-05-07 Perforation 941.50 945.50 13
1997-09-13 Perforation 216.50 222.50 14
1997-09-15 Perforation 238.00 241.50 14
1997-09-15 Perforation 243.00 244.00 14
2019-03-28 Packing Device Capped w/Cement 917.00 925.00 0
2019-03-28 Packing Device Capped w/Cement 203.00 211.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References