X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394070406020

Well Details

Well ID: 0394070406020
Loading map...
Location: 02/06-04-039-07W4/0
Location Alias: 02/06-04-39-07 W4M
Location Alias 2: 02/06-04-039-07 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 07
Section: 04
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 6-4-39-7
Operator Name: Cleo Energy Corp.
License Number: 0140476
License Date: 1989-07-26
License Status: Abandoned
Spud Date: 1989-10-27
Final Drill Date: 1989-10-30
Well Total Depth: 926.00 m
Surface Hole Latitude: 52.324242
Surface Hole Longitude: -110.953749

For data sources see[1][2]

Well History

Date Event
1989-07-26 Obtained License
1989-10-28 Surface Casing Operation Performed
1989-10-30 Finished Drilling
1989-10-31 Well Log Performed
1989-11-01 Drill Stem Test Performed
1989-11-02 Production Casing Operation Performed
1989-11-02 Rig Released
1990-02-09 Well Log Performed
1990-02-10 Perforation Treatment Performed - Jet Perforation
1990-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-11 Plug Back Performed
1990-02-11 Well Log Performed
1990-02-12 Perforation Treatment Performed - Jet Perforation
1990-02-12 Well Log Performed
1990-02-14 Well Mode changed to Drilled and Cased
2009-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-09 Plug Back Performed
2009-03-09 Well Log Performed
2009-03-09 Well Mode changed to Abandoned Zone
2009-05-27 Well Abandoned
2009-05-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-10 Perforation 877.40 879.00 13
1990-02-11 Packing Device Capped w/Cement 857.00 865.00 0
1990-02-12 Perforation 842.00 843.00 13
2009-03-08 Packing Device Capped w/Cement 861.80 869.80 0
2009-03-09 Packing Device Capped w/Cement 829.80 837.80 0

For data sources see[4]



References