X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394050106020

Well Details

Well ID: 0394050106020
Loading map...
Location: 02/06-01-039-05W4/0
Location Alias: 02/06-01-39-05 W4M
Location Alias 2: 02/06-01-039-05 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 05
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: ZAPATA PROVO 6-1-39-5
Operator Name: Surge Energy Inc.
License Number: 0116773
License Date: 1985-08-08
License Status: Abandoned
Spud Date: 1985-08-14
Final Drill Date: 1985-08-21
Well Total Depth: 920.00 m
Surface Hole Latitude: 52.323071
Surface Hole Longitude: -110.594295

For data sources see[1][2]

Well History

Date Event
1985-08-08 Obtained License
1985-08-16 Surface Casing Operation Performed
1985-08-21 Finished Drilling
1985-08-21 Well Log Performed
1985-08-22 Production Casing Operation Performed
1985-08-22 Rig Released
1986-01-25 Well Mode changed to Drilled and Cased
1987-09-18 Perforation Treatment Performed - Cement Squeeze
1987-09-18 Perforation Treatment Performed - Jet Perforation
1987-09-20 Well Began Production
1987-09-20 Well Fluid changed to Crude Oil
1987-09-20 Well Mode changed to Pumping
1987-09-22 Perforation Treatment Performed - Jet Perforation
1993-12-31 Well Fluid changed to Crude Oil
1993-12-31 Well Mode changed to Suspended
1995-02-17 Perforation Treatment Performed - Cement Squeeze
1995-02-22 Well Log Performed
1995-02-23 Perforation Treatment Performed - Jet Perforation
1995-03-20 Well Began Injection
1995-03-20 Well Fluid changed to Water
1995-03-20 Well Type changed to Disposal
1995-03-23 Well Log Performed
1995-03-24 Well Log Performed
2008-06-16 Perforation Treatment Performed - Jet Perforation
2017-12-31 Well Fluid changed to Water
2017-12-31 Well Mode changed to Suspended
2017-12-31 Well Type changed to Disposal
2019-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-18 Plug Back Performed
2019-08-18 Well Fluid changed to Water
2019-08-18 Well Log Performed
2019-08-18 Well Mode changed to Abandoned Zone
2019-08-18 Well Type changed to Disposal
2019-09-07 Well Abandoned
2019-09-07 Well Fluid changed to Water
2019-09-07 Well Mode changed to Abandoned
2019-09-07 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-18 Perforation 848.50 849.00 13
1987-09-18 Cement Squeeze 848.50 849.00 0
1987-09-22 Perforation 845.00 847.00 13
1995-02-17 Cement Squeeze 845.00 847.00 0
1995-02-23 Perforation 869.00 874.00 17
2008-06-16 Perforation 865.00 880.00 20
2019-08-18 Packing Device Capped w/Cement 828.00 836.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2238 0.0 0.0 0.0
1988 8582 0.0 0.0 0.0
1989 8668 0.0 0.0 0.0
1990 8451 0.0 0.0 0.0
1991 8617 0.0 0.0 0.0
1992 8523 0.0 0.0 0.0
1993 3744 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References