X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394040309040

Well Details

Well ID: 0394040309040
Loading map...
Location: 04/09-03-039-04W4/0
Location Alias: 04/09-03-39-04 W4M
Location Alias 2: 04/09-03-039-04 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 04
Section: 03
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 9-3-39-4
Operator Name: Bow River Energy Ltd.
License Number: 0203405
License Date: 1997-07-14
License Status: Suspension
Spud Date: 1997-07-18
Final Drill Date: 1997-07-20
Well Total Depth: 828.00 m
Surface Hole Latitude: 52.326880
Surface Hole Longitude: -110.485637

For data sources see[1][2]

Well History

Date Event
1997-07-14 Obtained License
1997-07-18 Surface Casing Operation Performed
1997-07-19 Direction Drilling Operation Performed - Deviate
1997-07-20 Finished Drilling
1997-07-20 Well Log Performed
1997-07-20 Well Mode changed to Drilled and Cased
1997-07-21 Production Casing Operation Performed
1997-07-21 Rig Released
1997-07-23 Perforation Treatment Performed - Jet Perforation
1997-07-23 Well Log Performed
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-24 Well Log Performed
1997-08-11 Well Began Production
1997-08-11 Well Fluid changed to Crude Oil
1997-08-11 Well Mode changed to Pumping
1997-08-13 Well Log Performed
2006-08-01 Well Fluid changed to Crude Oil
2006-08-01 Well Mode changed to Suspended
2007-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-04-28 Plug Back Performed
2007-04-28 Well Fluid changed to Crude Oil
2007-04-28 Well Log Performed
2007-04-28 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-19 317.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-23 Perforation 798.80 800.00 14
1997-07-24 Perforation 798.80 800.00 14
2007-04-28 Packing Device Capped w/Cement 782.00 790.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3375 0.0 0.0 0.0
1998 8673 0.0 0.0 0.0
1999 8704 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 8703 0.0 0.0 0.0
2002 8132 0.0 0.0 0.0
2003 8587 0.0 0.0 0.0
2004 7732 0.0 0.0 0.0
2005 8167 0.0 0.0 0.0
2006 96 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2007-04-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References