X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394032416022

Well Details

Well ID: 0394032416022
Loading map...
Location: 02/16-24-039-03W4/2
Location Alias: 02/16-24-39-03 W4M
Location Alias 2: 02/16-24-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 24
County/Municipality: Municipal District of Provost No. 52
Well Name: EMI PROVOST 16-24-39-3
Operator Name: Enerplus Corporation
License Number: 0166010
License Date: 1994-03-21
License Status: RecCertified
Spud Date: 1994-05-12
Final Drill Date: 1994-05-15
Well Total Depth: 890.00 m
Surface Hole Latitude: 52.373842
Surface Hole Longitude: -110.293953

For data sources see[1][2]

Well History

Date Event
1994-03-21 Obtained License
1994-05-13 Direction Drilling Operation Performed - Deviate
1994-05-13 Surface Casing Operation Performed
1994-05-15 Finished Drilling
1994-05-15 Well Log Performed
1994-05-15 Well Mode changed to Drilled and Cased
1994-05-16 Production Casing Operation Performed
1994-05-16 Rig Released
1994-06-01 Perforation Treatment Performed - Jet Perforation
1994-07-04 Well Log Performed
2004-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-04 Perforation Treatment Performed - Jet Perforation
2007-12-05 Well Log Performed
2007-12-06 Perforation Treatment Performed - Jet Perforation
2007-12-06 Well Log Performed
2007-12-18 Perforation Treatment Performed - Fractured
2009-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-19 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-07-19 Plug Back Performed
2009-07-19 Well Log Performed
2009-07-19 Well Mode changed to Abandoned Zone
2009-08-12 Well Abandoned
2009-08-12 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-05-13 230.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-01 Perforation 805.00 807.50 13
2004-08-09 Packing Device Capped w/Cement 796.50 804.50 0
2007-12-04 Perforation 805.00 807.50 13
2007-12-06 Perforation 772.50 778.50 20
2007-12-18 Fracture 772.50 778.50 0
2009-07-19 Packing Dev Cpd w/Res-Gyp Cem 786.00 790.00 0
2009-07-19 Packing Device Capped w/Cement 753.00 769.00 0

For data sources see[5]



References