X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394031407003

Well Details

Well ID: 0394031407003
Loading map...
Location: 00/07-14-039-03W4/3
Location Alias: 00/07-14-39-03 W4M
Location Alias 2: 00/07-14-039-03 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE COHO PROVOST 7-14-39-3
Operator Name: Enerplus Corporation
License Number: 0135810
License Date: 1988-08-25
License Status: Issued
Spud Date: 1988-09-03
Final Drill Date: 1988-09-06
Well Total Depth: 825.00 m
Surface Hole Latitude: 52.353328
Surface Hole Longitude: -110.328020

For data sources see[1][2]

Well History

Date Event
1988-08-25 Obtained License
1988-09-04 Surface Casing Operation Performed
1988-09-06 Finished Drilling
1988-09-06 Well Mode changed to Drilled and Cased
1988-09-07 Production Casing Operation Performed
1988-09-07 Rig Released
1988-09-07 Well Log Performed
1988-09-15 Well Log Performed
1988-09-18 Perforation Treatment Performed - Jet Perforation
1988-09-20 Perforation Treatment Performed - Cement Squeeze
1988-09-23 Well Log Performed
1988-09-24 Perforation Treatment Performed - Jet Perforation
1988-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-28 Plug Back Performed
1988-09-28 Well Log Performed
1988-09-29 Perforation Treatment Performed - Fractured
1995-02-24 Perforation Treatment Performed - Cement Squeeze
1995-02-24 Plug Back Performed
1995-03-03 Perforation Treatment Performed - Jet Perforation
1995-03-04 Well Log Performed
1995-03-05 Perforation Treatment Performed - Jet Perforation
1997-06-26 Well Log Performed
2004-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-20 Perforation Treatment Performed - Jet Perforation
2004-06-23 Perforation Treatment Performed - Fractured
2004-07-11 Well Began Production
2004-07-11 Well Fluid changed to Crude Oil
2004-07-11 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-18 Perforation 771.00 775.00 13
1995-03-05 Perforation 776.00 777.00 13
2004-06-20 Packing Device Capped w/Cement 757.00 765.00 0
2004-06-20 Perforation 738.50 743.00 20
2004-06-23 Fracture 738.50 743.00 0
1988-09-20 Cement Squeeze 771.00 775.00 0
1988-09-24 Perforation 770.00 772.00 13
1988-09-24 Perforation 772.00 775.00 13
1988-09-28 Packing Device Capped w/Cement 757.00 765.00 0
1988-09-28 Perforation 738.50 741.00 13
1988-09-29 Fracture 738.50 741.00 0
1995-02-24 Cement Squeeze 738.50 741.00 0
1995-03-03 Perforation 770.00 775.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 4107 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8714 0.0 0.0 0.0
2007 8722 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8447 0.0 0.0 0.0
2010 8541 0.0 0.0 0.0
2011 8723 0.0 0.0 0.0
2012 8031 0.0 0.0 0.0
2013 8477 0.0 0.0 0.0
2014 8421 0.0 0.0 0.0
2015 8198 0.0 0.0 0.0
2016 8708 0.0 0.0 0.0
2017 8579 0.0 0.0 0.0
2018 8743 0.0 0.0 0.0
2019 8239 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References