X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394030705032

Well Details

Well ID: 0394030705032
Loading map...
Location: 03/05-07-039-03W4/2
Location Alias: 03/05-07-39-03 W4M
Location Alias 2: 03/05-07-039-03 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 07
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 5-7-39-3
Operator Name: Bow River Energy Ltd.
License Number: 0173147
License Date: 1994-11-29
License Status: Suspension
Spud Date: 1994-12-12
Final Drill Date: 1994-12-14
Well Total Depth: 847.00 m
Surface Hole Latitude: 52.338173
Surface Hole Longitude: -110.431401

For data sources see[1][2]

Well History

Date Event
1994-11-29 Obtained License
1994-12-12 Surface Casing Operation Performed
1994-12-13 Direction Drilling Operation Performed - Deviate
1994-12-14 Finished Drilling
1994-12-14 Well Log Performed
1994-12-14 Well Mode changed to Drilled and Cased
1994-12-15 Production Casing Operation Performed
1994-12-15 Rig Released
1994-12-20 Perforation Treatment Performed - Jet Perforation
1995-01-23 Well Log Performed
2007-10-14 Well Log Performed
2007-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-17 Perforation Treatment Performed - Jet Perforation
2007-10-17 Well Log Performed
2007-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-19 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-12-13 356.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-20 Perforation 803.00 804.50 13
1994-12-20 Perforation 808.00 813.50 13
2007-10-17 Packing Device Capped w/Cement 791.00 799.00 0
2007-10-17 Perforation 713.50 717.50 20
2007-10-19 Packing Device Capped w/Cement 700.50 708.50 0

For data sources see[5]



References