X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394030109000

Well Details

Well ID: 0394030109000
Loading map...
Location: 00/09-01-039-03W4/0
Location Alias: 00/09-01-39-03 W4M
Location Alias 2: 00/09-01-039-03 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 9-1-39-3
Operator Name: Surge Energy Inc.
License Number: 0164279
License Date: 1994-01-24
License Status: Issued
Spud Date: 1994-01-25
Final Drill Date: 1994-01-28
Well Total Depth: 925.00 m
Surface Hole Latitude: 52.322391
Surface Hole Longitude: -110.295776

For data sources see[1][2]

Well History

Date Event
1994-01-24 Obtained License
1994-01-26 Direction Drilling Operation Performed - Deviate
1994-01-26 Surface Casing Operation Performed
1994-01-27 Well Log Performed
1994-01-28 Drill Stem Test Performed
1994-01-28 Finished Drilling
1994-01-28 Well Log Performed
1994-01-28 Well Mode changed to Drilled and Cased
1994-01-29 Production Casing Operation Performed
1994-01-29 Rig Released
1994-01-31 Perforation Treatment Performed - Jet Perforation
1994-01-31 Well Log Performed
1994-02-02 Perforation Treatment Performed - Jet Perforation
1994-02-02 Well Log Performed
1994-02-04 Perforation Treatment Performed - Fractured
1994-02-07 Perforation Treatment Performed - Jet Perforation
1994-02-09 Perforation Treatment Performed - Jet Perforation
1994-02-09 Well Log Performed
1994-02-21 Well Began Production
1994-02-21 Well Fluid changed to Crude Oil
1994-02-21 Well Mode changed to Pumping
1994-03-23 Perforation Treatment Performed - Jet Perforation
1994-03-23 Well Log Performed
1994-07-01 Well Fluid changed to Crude Oil
1994-07-01 Well Mode changed to Pumping
1995-08-25 Well Log Performed
2006-11-13 Well Log Performed
2006-11-23 Perforation Treatment Performed - Jet Perforation
2006-11-23 Well Log Performed
2007-08-13 Well Log Performed
2007-08-21 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-26 188.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-31 Perforation 848.00 849.50 13
1994-02-02 Perforation 852.00 855.00 13
1994-02-04 Fracture 848.00 855.00 0
1994-02-07 Perforation 862.00 863.50 13
1994-02-09 Perforation 866.00 867.00 13
1994-03-23 Perforation 747.00 748.50 13
1994-03-23 Perforation 750.00 752.00 13
2006-11-23 Perforation 750.00 752.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 7297 0.0 0.0 0.0
1995 7522 0.0 0.0 0.0
1996 8647 0.0 0.0 0.0
1997 8714 0.0 0.0 0.0
1998 8715 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8705 0.0 0.0 0.0
2001 8717 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8757 0.0 0.0 0.0
2004 2974 0.0 0.0 0.0
2005 5370 0.0 0.0 0.0
2006 8111 0.0 0.0 0.0
2007 8296 0.0 0.0 0.0
2008 8739 0.0 0.0 0.0
2009 8708 0.0 0.0 0.0
2010 8183 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 8724 0.0 0.0 0.0
2013 8535 0.0 0.0 0.0
2014 8602 0.0 0.0 0.0
2015 8440 0.0 0.0 0.0
2016 8530 0.0 0.0 0.0
2017 8564 0.0 0.0 0.0
2018 8346 0.0 0.0 0.0
2019 8413 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References