X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394030102003

Well Details

Well ID: 0394030102003
Loading map...
Location: 00/02-01-039-03W4/3
Location Alias: 00/02-01-39-03 W4M
Location Alias 2: 00/02-01-039-03 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 03
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 2-1-39-3
Operator Name: Surge Energy Inc.
License Number: 0114904
License Date: 1985-05-28
License Status: Suspension
Spud Date: 1985-08-29
Final Drill Date: 1985-09-01
Well Total Depth: 855.00 m
Surface Hole Latitude: 52.320678
Surface Hole Longitude: -110.303205

For data sources see[1][2]

Well History

Date Event
1985-05-28 Obtained License
1985-08-30 Surface Casing Operation Performed
1985-09-01 Finished Drilling
1985-09-01 Well Log Performed
1985-09-01 Well Mode changed to Drilled and Cased
1985-09-02 Drill Stem Test Performed
1985-09-03 Production Casing Operation Performed
1985-09-03 Rig Released
1985-09-20 Well Log Performed
1985-09-21 Perforation Treatment Performed - Jet Perforation
1987-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-04-21 Perforation Treatment Performed - Jet Perforation
1987-04-21 Plug Back Performed
1987-04-21 Well Log Performed
1988-01-21 Perforation Treatment Performed - Fractured
1992-01-10 Perforation Treatment Performed - Jet Perforation
1992-01-13 Well Log Performed
2002-07-02 Well Log Performed
2002-07-03 Well Log Performed
2002-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-04 Plug Back Performed
2002-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-05 Perforation Treatment Performed - Jet Perforation
2002-07-05 Plug Back Performed
2002-07-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-21 Perforation 795.00 798.00 39
1987-04-21 Packing Device Capped w/Cement 793.00 794.00 0
1987-04-21 Perforation 782.50 789.00 7
1988-01-21 Fracture 782.50 789.00 0
1992-01-10 Perforation 795.00 798.00 39
2002-07-04 Packing Device Capped w/Cement 772.00 780.00 0
2002-07-05 Perforation 744.00 745.00 20
2002-07-05 Packing Device Capped w/Cement 729.00 737.00 0

For data sources see[4]



References