X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394023013A02

Well Details

Well ID: 0394023013A02
Loading map...
Location: A0/13-30-039-02W4/2
Location Alias: A0/13-30-39-02 W4M
Location Alias 2: A0/13-30-039-02 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 30
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 13-30-39-2
Operator Name: Surge Energy Inc.
License Number: 0147801
License Date: 1991-02-05
License Status: Abandoned
Spud Date: 1991-02-14
Final Drill Date: 1991-02-16
Well Total Depth: 866.00 m
Surface Hole Latitude: 52.386848
Surface Hole Longitude: -110.287055

For data sources see[1][2]

Well History

Date Event
1991-02-05 Obtained License
1991-02-15 Surface Casing Operation Performed
1991-02-16 Finished Drilling
1991-02-16 Well Mode changed to Drilled and Cased
1991-02-17 Production Casing Operation Performed
1991-02-17 Rig Released
1991-02-17 Well Log Performed
1991-02-19 Perforation Treatment Performed - Jet Perforation
2008-05-31 Perforation Treatment Performed - Cement Squeeze
2008-06-04 Perforation Treatment Performed - Jet Perforation
2008-06-07 Well Began Production
2008-06-07 Well Fluid changed to Water
2008-06-07 Well Type changed to Source
2010-08-26 Well Fluid changed to Water
2010-08-26 Well Mode changed to Suspended
2010-08-26 Well Type changed to Source
2019-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-19 Plug Back Performed
2019-09-19 Well Fluid changed to Water
2019-09-19 Well Mode changed to Abandoned Zone
2019-09-19 Well Type changed to Source
2019-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-20 Plug Back Performed
2019-09-20 Well Abandoned
2019-09-20 Well Fluid changed to Water
2019-09-20 Well Mode changed to Abandoned
2019-09-20 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-19 Perforation 795.00 796.50 13
2008-05-31 Cement Squeeze 795.00 796.50 0
2008-06-04 Perforation 836.90 840.70 17
2008-06-04 Perforation 844.90 848.10 17
2019-09-19 Packing Device Capped w/Cement 822.00 830.00 0
2019-09-20 Packing Device Capped w/Cement 777.00 785.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2832 0.0 0.0 0.0
2009 7613 0.0 0.0 0.0
2010 2831 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-19 No Incident Encountered 0.00 0.00
2019-09-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References