X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394022301020

Well Details

Well ID: 0394022301020
Loading map...
Location: 02/01-23-039-02W4/0
Location Alias: 02/01-23-39-02 W4M
Location Alias 2: 02/01-23-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 23
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY 102HZ PROVOST 1-23-39-2
Operator Name: Surge Energy Inc.
License Number: 0493347
License Date: 2019-01-09
License Status: Issued
Spud Date: 2019-05-20
Final Drill Date: 2019-05-23
Well Total Depth: 2286.00 m
Surface Hole Latitude: 52.363057
Surface Hole Longitude: -110.198649

For data sources see[1][2]

Well History

Date Event
2019-01-09 Obtained License
2019-05-20 Direction Drilling Operation Performed - Deviate
2019-05-20 Drill To LD
2019-05-21 Surface Casing Operation Performed
2019-05-22 Direction Drilling Operation Performed - Horizontal
2019-05-23 Finished Drilling
2019-05-23 Well Log Performed
2019-05-23 Well Mode changed to Drilled and Cased
2019-05-25 Production Casing Operation Performed
2019-05-26 Rig Released
2019-06-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-30 Well Began Production
2019-06-30 Well Fluid changed to Crude Oil
2019-06-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-05-20 Precision Drilling Corporation 145 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-05-20 507.80 Deviate (5 - 79 degrees)
2019-05-22 876.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-12 Multi-Stage Fracture 2257.20 2257.30 0
2019-06-12 Multi-Stage Fracture 1778.80 1778.90 0
2019-06-12 Multi-Stage Fracture 1723.70 1723.80 0
2019-06-12 Multi-Stage Fracture 1668.90 1669.00 0
2019-06-12 Multi-Stage Fracture 1613.80 1613.90 0
2019-06-12 Multi-Stage Fracture 1558.80 1558.90 0
2019-06-12 Multi-Stage Fracture 1503.90 1504.00 0
2019-06-12 Multi-Stage Fracture 1449.00 1449.10 0
2019-06-12 Multi-Stage Fracture 1394.20 1394.30 0
2019-06-12 Multi-Stage Fracture 1339.20 1339.30 0
2019-06-12 Multi-Stage Fracture 1283.70 1283.80 0
2019-06-12 Multi-Stage Fracture 2211.90 2212.00 0
2019-06-12 Multi-Stage Fracture 1228.70 1228.80 0
2019-06-12 Multi-Stage Fracture 1173.70 1173.80 0
2019-06-12 Multi-Stage Fracture 1119.40 1119.50 0
2019-06-12 Multi-Stage Fracture 1065.80 1065.90 0
2019-06-12 Multi-Stage Fracture 1011.20 1011.30 0
2019-06-12 Multi-Stage Fracture 957.50 957.60 0
2019-06-12 Multi-Stage Fracture 916.10 916.20 0
2019-06-12 Multi-Stage Fracture 2161.90 2162.00 0
2019-06-12 Multi-Stage Fracture 2106.90 2107.00 0
2019-06-12 Multi-Stage Fracture 2053.30 2053.40 0
2019-06-12 Multi-Stage Fracture 1998.50 1998.60 0
2019-06-12 Multi-Stage Fracture 1943.50 1943.60 0
2019-06-12 Multi-Stage Fracture 1888.50 1888.60 0
2019-06-12 Multi-Stage Fracture 1833.80 1833.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-12 2019-06-12 769 773 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 74.103 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 25.3558 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0143 N/A
Methyl Alcohol 67-56-1 100 0.0143 N/A
Non-Hazardous Ingredients Not Available 100 0.0143 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0548 N/A
Sodium chloride 7647-14-5 100 0.0548 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.069 N/A
Non-Hazardous Ingredients Not Available 100 0.069 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.0708 N/A
Water 7732-18-5 100 0.0708 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2796 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2796 N/A
SFE-5 (Nano Surfactant) Step Energy Services Surfactant Proprietary Trade Secret 100 0.0523 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-12 2019-06-13 Surface Water - Lake 773

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4411 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-26 No Incident Encountered 0.00 0.00
2019-06-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References