X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394022003000

Well Details

Well ID: 0394022003000
Loading map...
Location: 00/03-20-039-02W4/0
Location Alias: 00/03-20-39-02 W4M
Location Alias 2: 00/03-20-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY HZ PROVOST 3-20-39-2
Operator Name: Surge Energy Inc.
License Number: 0495411
License Date: 2019-08-09
License Status: Amended
Spud Date: 2019-09-15
Final Drill Date: 2019-09-19
Well Total Depth: 2910.00 m
Surface Hole Latitude: 52.363272
Surface Hole Longitude: -110.224380

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-09-15 Precision Drilling Corporation 145 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-09-15 508.80 Deviate (5 - 79 degrees)
2019-09-16 864.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-10 Multi-Stage Fracture 2873.80 2873.90 0
2019-10-10 Multi-Stage Fracture 2382.20 2382.30 0
2019-10-10 Multi-Stage Fracture 2326.90 2327.00 0
2019-10-10 Multi-Stage Fracture 2272.10 2272.20 0
2019-10-10 Multi-Stage Fracture 2217.10 2217.20 0
2019-10-10 Multi-Stage Fracture 2162.00 2162.10 0
2019-10-10 Multi-Stage Fracture 2106.70 2106.80 0
2019-10-10 Multi-Stage Fracture 2051.40 2051.50 0
2019-10-10 Multi-Stage Fracture 1996.10 1996.20 0
2019-10-10 Multi-Stage Fracture 1941.60 1941.70 0
2019-10-10 Multi-Stage Fracture 1886.30 1886.40 0
2019-10-10 Multi-Stage Fracture 2823.50 2823.60 0
2019-10-10 Multi-Stage Fracture 1831.00 1831.10 0
2019-10-10 Multi-Stage Fracture 1776.20 1776.30 0
2019-10-10 Multi-Stage Fracture 1720.80 1720.90 0
2019-10-11 Multi-Stage Fracture 1665.60 1665.70 0
2019-10-11 Multi-Stage Fracture 1610.70 1610.80 0
2019-10-11 Multi-Stage Fracture 1555.60 1555.70 0
2019-10-11 Multi-Stage Fracture 1500.30 1500.40 0
2019-10-11 Multi-Stage Fracture 1445.00 1445.10 0
2019-10-11 Multi-Stage Fracture 1389.80 1389.90 0
2019-10-11 Multi-Stage Fracture 1334.50 1334.60 0
2019-10-10 Multi-Stage Fracture 2768.40 2768.50 0
2019-10-11 Multi-Stage Fracture 1279.60 1279.70 0
2019-10-11 Multi-Stage Fracture 1224.30 1224.40 0
2019-10-11 Multi-Stage Fracture 1169.50 1169.60 0
2019-10-11 Multi-Stage Fracture 1114.20 1114.30 0
2019-10-11 Multi-Stage Fracture 1058.90 1059.00 0
2019-10-11 Multi-Stage Fracture 1003.60 1003.70 0
2019-10-11 Multi-Stage Fracture 948.30 948.40 0
2019-10-11 Multi-Stage Fracture 893.20 893.30 0
2019-10-10 Multi-Stage Fracture 2713.20 2713.30 0
2019-10-10 Multi-Stage Fracture 2658.00 2658.10 0
2019-10-10 Multi-Stage Fracture 2602.60 2602.70 0
2019-10-10 Multi-Stage Fracture 2547.30 2547.40 0
2019-10-10 Multi-Stage Fracture 2492.10 2492.20 0
2019-10-10 Multi-Stage Fracture 2437.00 2437.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-10 2019-10-11 754 1,153 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 74.9606 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 24.5835 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0189 N/A
Methyl Alcohol 67-56-1 100 0.0189 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0478 N/A
Sodium chloride 7647-14-5 100 0.0478 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0813 N/A
Non-Hazardous Ingredients Not Available 100 0.0813 N/A
SBX-2C (Crosslinker) STEP Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0386 N/A
Ethylene Glycol 107-21-1 100 0.0386 N/A
Monoethanolamine 141-43-5 100 0.0386 N/A
Water 7732-18-5 100 0.0386 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2283 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.2283 N/A
SFE-5 (Nano Surfactant) Step Energy Services Surfactant Proprietary Trade Secret 100 0.0407 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-10-11 2019-10-11 Surface Water - Lake 1153

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1592 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-21 No Incident Encountered 0.00 0.00
2019-10-15 No Incident Encountered 0.00 0.00

For data sources see[9]

References