X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394021514000

Well Details

Well ID: 0394021514000
Loading map...
Location: 00/14-15-039-02W4/0
Location Alias: 00/14-15-39-02 W4M
Location Alias 2: 00/14-15-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 15
County/Municipality: Municipal District of Provost No. 52
Well Name: BLACK SHIRE PROVOST 14-15-39-2
Operator Name: Twin Butte Energy Ltd.
License Number: 0187817
License Date: 1996-05-15
License Status: RecCertified
Spud Date: 1996-06-01
Final Drill Date: 1996-06-02
Well Total Depth: 850.00 m
Surface Hole Latitude: 52.358135
Surface Hole Longitude: -110.209657

For data sources see[1][2]

Well History

Date Event
1996-05-15 Obtained License
1996-06-01 Surface Casing Operation Performed
1996-06-02 Finished Drilling
1996-06-02 Well Log Performed
1996-06-02 Well Mode changed to Drilled and Cased
1996-06-03 Production Casing Operation Performed
1996-06-03 Rig Released
1996-06-03 Well Log Performed
1996-07-19 Well Log Performed
1996-07-20 Perforation Treatment Performed - Jet Perforation
1996-07-20 Well Log Performed
1996-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-01 Well Began Production
1996-08-01 Well Fluid changed to Crude Oil
1996-08-01 Well Mode changed to Pumping
1996-08-22 Well Log Performed
1996-08-27 Well Log Performed
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Suspended
2002-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-25 Plug Back Performed
2002-09-25 Well Abandoned
2002-09-25 Well Fluid changed to Crude Oil
2002-09-25 Well Log Performed
2002-09-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-20 Perforation 702.50 704.00 18
1996-07-20 Perforation 705.00 706.00 18
1996-07-20 Perforation 707.50 708.50 18
1996-07-20 Perforation 695.50 700.50 18
1996-07-20 Perforation 701.00 701.50 18
1996-07-27 Packing Device Capped w/Cement 706.80 707.10 0
2002-09-25 Packing Device Capped w/Cement 682.00 690.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 843 0.0 0.0 0.0

For data sources see[5]

References