If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0394021503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.362178,"lon":-110.212459,"icon":""}]} |
| Location: 00/03-15-039-02W4/0 | |
| Location Alias: 00/03-15-39-02 W4M | |
| Location Alias 2: 00/03-15-039-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 039 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 15 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: SURGE ENERGY HZ PROVOST 3-15-39-2 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0494008 | |
| License Date: 2019-03-20 | |
| License Status: Amended | |
| Spud Date: 2019-12-16 | |
| Final Drill Date: 2020-01-12 | |
| Well Total Depth: 2216.30 m | |
| Surface Hole Latitude: 52.362178 | |
| Surface Hole Longitude: -110.212459 |
| Date | Event |
|---|---|
| 2019-03-20 | Obtained License |
| 2019-12-16 | Set Surface |
| 2019-12-16 | Surface Casing Operation Performed |
| 2020-01-09 | Direction Drilling Operation Performed - Deviate |
| 2020-01-09 | Drill To LD |
| 2020-01-10 | Direction Drilling Operation Performed - Horizontal |
| 2020-01-12 | Finished Drilling |
| 2020-01-12 | Well Log Performed |
| 2020-01-12 | Well Mode changed to Drilled and Cased |
| 2020-01-13 | Production Casing Operation Performed |
| 2020-01-14 | Rig Released |
| 2020-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-02-06 | Well Began Production |
| 2020-02-06 | Well Fluid changed to Crude Oil |
| 2020-02-06 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2020-01-09 | Precision Drilling Corporation | 145 | Drill To LD | |
| 2019-12-16 | Hertz & Paluck Energy Services Inc. | 1 | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2020-01-09 | 412.30 | Deviate (5 - 79 degrees) |
| 2020-01-10 | 972.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2020-01-25 | Multi-Stage Fracture | 2184.50 | 2184.60 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1690.10 | 1690.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1634.80 | 1634.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1579.70 | 1579.80 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1524.80 | 1524.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1469.40 | 1469.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1414.10 | 1414.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1358.80 | 1358.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1304.10 | 1304.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1248.80 | 1248.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1193.00 | 1193.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2131.20 | 2131.30 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1137.90 | 1138.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1082.60 | 1082.70 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1027.50 | 1027.60 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2076.00 | 2076.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2020.90 | 2021.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1966.40 | 1966.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1911.30 | 1911.40 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1856.00 | 1856.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1800.70 | 1800.80 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 1745.40 | 1745.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-01-25 | 2020-01-25 | 760 | 680 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 75.0566 | N/A | |||
| 16/30 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 24.4917 | N/A | ||
| Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.015 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.015 | N/A | ||||
| SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0463 | N/A | |
| Sodium chloride | 7647-14-5 | 100 | 0.0463 | N/A | ||||
| SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0729 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0729 | N/A | ||||
| SBX-2C (Crosslinker) | STEP Energy Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0388 | N/A | |
| Ethylene Glycol | 107-21-1 | 100 | 0.0388 | N/A | ||||
| Monoethanolamine | 141-43-5 | 100 | 0.0388 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0388 | N/A | ||||
| SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.2321 | N/A | |
| Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.2321 | N/A | ||||
| SFE-5W (Nano Surfactant) | Step Energy Services | Surfactant | Methanol | 67-56-1 | 100 | 0.0463 | N/A | |
| Proprietary | Trade Secret | 100 | 0.0463 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2020-01-25 | 2020-01-25 | Surface Water - Lake | 680 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 1319 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2020-01-14 | No Incident Encountered | 0.00 | 0.00 |
| 2020-01-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]