X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394021205030

Well Details

Well ID: 0394021205030
Loading map...
Location: 03/05-12-039-02W4/0
Location Alias: 03/05-12-39-02 W4M
Location Alias 2: 03/05-12-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 5-12-39-2
Operator Name: Bow River Energy Ltd.
License Number: 0192173
License Date: 1996-10-10
License Status: Suspension
Spud Date: 1996-10-17
Final Drill Date: 1996-10-20
Well Total Depth: 866.00 m
Surface Hole Latitude: 52.336755
Surface Hole Longitude: -110.169982

For data sources see[1][2]

Well History

Date Event
1996-10-10 Obtained License
1996-10-18 Surface Casing Operation Performed
1996-10-19 Direction Drilling Operation Performed - Deviate
1996-10-20 Finished Drilling
1996-10-20 Well Log Performed
1996-10-20 Well Mode changed to Drilled and Cased
1996-10-21 Production Casing Operation Performed
1996-10-21 Rig Released
1996-11-01 Perforation Treatment Performed - Jet Perforation
1996-11-08 Well Began Production
1996-11-08 Well Fluid changed to Crude Oil
1996-11-08 Well Mode changed to Pumping
1996-11-18 Well Log Performed
2000-05-15 Perforation Treatment Performed - Jet Perforation
2000-05-15 Well Fluid changed to Crude Oil
2000-05-15 Well Mode changed to Suspended
2000-05-16 Well Log Performed
2000-07-05 Well Began Injection
2000-07-05 Well Fluid changed to Water
2000-07-05 Well Type changed to Injection
2001-09-27 Perforation Treatment Performed - Jet Perforation
2001-09-27 Well Log Performed
2002-09-24 Well Log Performed
2002-09-25 Well Log Performed
2002-10-18 Perforation Treatment Performed - Cement Squeeze
2002-10-18 Plug Back Performed
2013-10-30 Well Log Performed
2015-11-18 Well Fluid changed to Water
2015-11-18 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-10-19 208.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-11-01 Perforation 803.50 804.50 13
2000-05-15 Perforation 804.50 807.00 13
2001-09-27 Perforation 829.00 849.00 20
2002-10-18 Cement Squeeze 803.50 807.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1270 0.0 0.0 0.0
1997 8566 0.0 0.0 0.0
1998 8269 0.0 0.0 0.0
1999 8575 0.0 0.0 0.0
2000 3186 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[6]

References