If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394021204030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.332659,"lon":-110.17195,"icon":""}]} |
Location: 03/04-12-039-02W4/0 | |
Location Alias: 03/04-12-39-02 W4M | |
Location Alias 2: 03/04-12-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 4-12-39-2 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0194424 | |
License Date: 1996-12-03 | |
License Status: Suspension | |
Spud Date: 1996-12-06 | |
Final Drill Date: 1996-12-08 | |
Well Total Depth: 864.00 m | |
Surface Hole Latitude: 52.332659 | |
Surface Hole Longitude: -110.171950 |
Date | Event |
---|---|
1996-12-03 | Obtained License |
1996-12-07 | Direction Drilling Operation Performed - Deviate |
1996-12-07 | Surface Casing Operation Performed |
1996-12-08 | Finished Drilling |
1996-12-08 | Well Mode changed to Drilled and Cased |
1996-12-09 | Production Casing Operation Performed |
1996-12-09 | Rig Released |
1996-12-19 | Perforation Treatment Performed - Jet Perforation |
1997-01-13 | Well Began Production |
1997-01-13 | Well Fluid changed to Crude Oil |
1997-01-13 | Well Mode changed to Pumping |
1997-01-16 | Well Log Performed |
1997-02-13 | Perforation Treatment Performed - Jet Perforation |
2012-06-27 | Well Fluid changed to Crude Oil |
2012-06-27 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-12-07 | 185.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-12-19 | Perforation | 805.00 | 806.50 | 13 |
1997-02-13 | Perforation | 805.00 | 806.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 8020 | 0.0 | 0.0 | 0.0 |
1998 | 6655 | 0.0 | 0.0 | 0.0 |
1999 | 7926 | 0.0 | 0.0 | 0.0 |
2000 | 8645 | 0.0 | 0.0 | 0.0 |
2001 | 3442 | 0.0 | 0.0 | 0.0 |
2002 | 720 | 0.0 | 0.0 | 0.0 |
2003 | 4564 | 0.0 | 0.0 | 0.0 |
2004 | 7839 | 0.0 | 0.0 | 0.0 |
2005 | 8638 | 0.0 | 0.0 | 0.0 |
2006 | 8103 | 0.0 | 0.0 | 0.0 |
2007 | 6183 | 0.0 | 0.0 | 0.0 |
2010 | 1272 | 0.0 | 0.0 | 0.0 |
2011 | 741 | 0.0 | 0.0 | 0.0 |
For data sources see[6]