If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394020216080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.328898,"lon":-110.17357,"icon":""}]} |
Location: 08/16-02-039-02W4/0 | |
Location Alias: 08/16-02-39-02 W4M | |
Location Alias 2: 08/16-02-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 02 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 16-2-39-2 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0255126 | |
License Date: 2001-05-17 | |
License Status: Suspension | |
Spud Date: 2001-06-25 | |
Final Drill Date: 2001-06-28 | |
Well Total Depth: 825.00 m | |
Surface Hole Latitude: 52.328898 | |
Surface Hole Longitude: -110.173570 |
Date | Event |
---|---|
2001-05-17 | Obtained License |
2001-06-26 | Surface Casing Operation Performed |
2001-06-27 | Direction Drilling Operation Performed - Deviate |
2001-06-28 | Finished Drilling |
2001-06-28 | Well Log Performed |
2001-06-29 | Production Casing Operation Performed |
2001-06-29 | Rig Released |
2001-06-29 | Well Mode changed to Drilled and Cased |
2001-07-09 | Well Log Performed |
2001-07-12 | Perforation Treatment Performed - Jet Perforation |
2001-07-23 | Well Began Production |
2001-07-23 | Well Fluid changed to Crude Oil |
2001-07-23 | Well Mode changed to Pumping |
2012-06-27 | Well Fluid changed to Crude Oil |
2012-06-27 | Well Mode changed to Suspended |
2017-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-31 | Well Log Performed |
2017-02-01 | Perforation Treatment Performed - Jet Perforation |
2017-02-01 | Well Log Performed |
2017-02-03 | Perforation Treatment Performed - Jet Perforation |
2017-02-03 | Well Log Performed |
2017-02-07 | Perforation Treatment Performed - Cement Plug |
2017-02-07 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-06-27 | 339.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-07-12 | Perforation | 767.00 | 770.50 | 20 |
2017-01-30 | Packing Device Capped w/Cement | 753.50 | 762.00 | 0 |
2017-02-01 | Perforation | 568.00 | 571.00 | 17 |
2017-02-01 | Perforation | 568.00 | 571.00 | 20 |
2017-02-03 | Perforation | 568.00 | 571.00 | 17 |
2017-02-07 | Remedial Casing Cementing | 568.00 | 571.00 | 0 |
2017-02-07 | Cement Plug | 546.10 | 595.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 3756 | 0.0 | 0.0 | 0.0 |
2002 | 8631 | 0.0 | 0.0 | 0.0 |
2003 | 8726 | 0.0 | 0.0 | 0.0 |
2004 | 8284 | 0.0 | 0.0 | 0.0 |
2005 | 8645 | 0.0 | 0.0 | 0.0 |
2006 | 7240 | 0.0 | 0.0 | 0.0 |
2007 | 3298 | 0.0 | 0.0 | 0.0 |
2010 | 432 | 0.0 | 0.0 | 0.0 |
2011 | 549 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]