X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394020216070

Well Details

Well ID: 0394020216070
Loading map...
Location: 07/16-02-039-02W4/0
Location Alias: 07/16-02-39-02 W4M
Location Alias 2: 07/16-02-039-02 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 16-2-39-2
Operator Name: Bow River Energy Ltd.
License Number: 0224458
License Date: 1999-07-15
License Status: Suspension
Spud Date: 1999-08-02
Final Drill Date: 1999-08-05
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.331551
Surface Hole Longitude: -110.174823

For data sources see[1][2]

Well History

Date Event
1999-07-15 Obtained License
1999-08-03 Direction Drilling Operation Performed - Deviate
1999-08-03 Surface Casing Operation Performed
1999-08-05 Finished Drilling
1999-08-05 Well Log Performed
1999-08-06 Production Casing Operation Performed
1999-08-06 Rig Released
1999-08-06 Well Mode changed to Drilled and Cased
1999-08-08 Perforation Treatment Performed - Jet Perforation
1999-08-09 Well Began Production
1999-08-09 Well Fluid changed to Crude Oil
1999-08-09 Well Mode changed to Pumping
1999-09-10 Well Log Performed
2006-08-09 Well Fluid changed to Crude Oil
2006-08-09 Well Mode changed to Suspended
2008-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-19 Perforation Treatment Performed - Jet Perforation
2008-06-19 Plug Back Performed
2008-06-19 Well Fluid changed to Crude Oil
2008-06-19 Well Mode changed to Abandoned Zone
2008-07-19 Perforation Treatment Performed - Fractured
2008-07-28 Well Fluid changed to Crude Oil
2008-07-28 Well Mode changed to Pumping
2008-11-01 Well Fluid changed to Crude Oil
2008-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-08-03 402.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-08 Perforation 781.50 783.50 13
2008-06-19 Packing Device Capped w/Cement 771.00 779.00 0
2008-06-19 Perforation 730.80 733.00 17
2008-07-19 Fracture 730.80 733.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3354 0.0 0.0 0.0
2000 8751 0.0 0.0 0.0
2001 8748 0.0 0.0 0.0
2002 8659 0.0 0.0 0.0
2003 8569 0.0 0.0 0.0
2004 8754 0.0 0.0 0.0
2005 8292 0.0 0.0 0.0
2006 275 0.0 0.0 0.0
2008 814 0.0 0.0 0.0

For data sources see[6]

References