If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394020210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.325379,"lon":-110.17978,"icon":""}]} |
Location: 00/10-02-039-02W4/0 | |
Location Alias: 00/10-02-39-02 W4M | |
Location Alias 2: 00/10-02-039-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 02 | |
Section: 02 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 10-2-39-2 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0400477 | |
License Date: 2008-09-04 | |
License Status: Abandoned | |
Spud Date: 2008-10-31 | |
Final Drill Date: 2008-11-02 | |
Well Total Depth: 835.00 m | |
Surface Hole Latitude: 52.325379 | |
Surface Hole Longitude: -110.179780 |
Date | Event |
---|---|
2008-09-04 | Obtained License |
2008-11-01 | Surface Casing Operation Performed |
2008-11-02 | Finished Drilling |
2008-11-02 | Well Mode changed to Drilled and Cased |
2008-11-03 | Production Casing Operation Performed |
2008-11-03 | Rig Released |
2008-11-03 | Well Log Performed |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-10 | Perforation Treatment Performed - Jet Perforation |
2009-04-09 | Well Began Production |
2009-04-09 | Well Fluid changed to Crude Oil |
2009-04-09 | Well Mode changed to Pumping |
2010-10-06 | Well Fluid changed to Crude Oil |
2010-10-06 | Well Mode changed to Suspended |
2017-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-02-14 | Plug Back Performed |
2017-02-27 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-06 | Perforation | 789.00 | 790.00 | 20 |
2009-02-10 | Perforation | 790.00 | 791.50 | 20 |
2017-02-14 | Packing Device Capped w/Cement | 777.00 | 785.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 792 | 0.0 | 0.0 | 0.0 |
2010 | 624 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]