If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385040316002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.243373,"lon":-114.482538,"icon":""}]} |
Location: 00/16-03-038-04W5/2 | |
Location Alias: 00/16-03-38-04 W5M | |
Location Alias 2: 00/16-03-038-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 04 | |
Section: 03 | |
County/Municipality: Clearwater County | |
Well Name: CVE SYLAKE 16-3-38-4 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0141410 | |
License Date: 1989-10-20 | |
License Status: Suspension | |
Spud Date: 1989-10-27 | |
Final Drill Date: 1989-11-08 | |
Well Total Depth: 2415.00 m | |
Surface Hole Latitude: 52.243373 | |
Surface Hole Longitude: -114.482538 |
Date | Event |
---|---|
1989-10-20 | Obtained License |
1989-10-27 | Lost Circulation Occurred |
1989-10-28 | Surface Casing Operation Performed |
1989-11-08 | Finished Drilling |
1989-11-08 | Well Mode changed to Drilled and Cased |
1989-11-09 | Well Log Performed |
1989-11-11 | Production Casing Operation Performed |
1989-11-11 | Rig Released |
1989-11-23 | Well Log Performed |
1989-11-25 | Perforation Treatment Performed - Jet Perforation |
1989-11-25 | Well Log Performed |
1989-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-11-30 | Perforation Treatment Performed - Fractured |
1989-12-02 | Well Log Performed |
1989-12-03 | Perforation Treatment Performed - Jet Perforation |
1989-12-08 | Well Log Performed |
1990-03-17 | Well Log Performed |
1990-03-18 | Perforation Treatment Performed - Cement Squeeze |
1990-03-18 | Plug Back Performed |
1990-03-20 | Perforation Treatment Performed - Jet Perforation |
1990-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-23 | Perforation Treatment Performed - Fractured |
1990-03-23 | Well Log Performed |
1990-03-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-05 | Well Began Production |
1990-04-05 | Well Fluid changed to Crude Oil |
1990-04-05 | Well Mode changed to Pumping |
1990-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-10-17 | Plug Back Performed |
1991-10-17 | Well Fluid changed to Crude Oil |
1991-10-17 | Well Mode changed to Abandoned Zone |
1991-10-18 | Perforation Treatment Performed - Jet Perforation |
1991-10-18 | Well Log Performed |
1991-10-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-10-23 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-11-25 | Perforation | 2344.00 | 2346.00 | 13 |
1990-03-24 | Acid Treatment | 2328.50 | 2332.00 | 0 |
1990-03-25 | Acid Treatment | 2328.50 | 2332.00 | 0 |
1990-11-07 | Acid Treatment | 2328.50 | 2332.00 | 0 |
1991-10-17 | Packing Device Capped w/Cement | 2311.70 | 2320.00 | 0 |
1991-10-18 | Perforation | 2280.00 | 2282.00 | 13 |
1991-10-19 | Acid Treatment | 2280.00 | 2282.00 | 0 |
1991-10-23 | Fracture | 2280.00 | 2282.00 | 0 |
1989-11-27 | Acid Treatment | 2344.00 | 2346.00 | 0 |
1989-11-28 | Acid Treatment | 2344.00 | 2346.00 | 0 |
1989-11-30 | Fracture | 2344.00 | 2346.00 | 0 |
1989-12-03 | Perforation | 2328.50 | 2331.50 | 13 |
1990-03-18 | Cement Squeeze | 2328.50 | 2346.00 | 0 |
1990-03-20 | Perforation | 2328.50 | 2332.00 | 13 |
1990-03-22 | Acid Treatment | 2328.50 | 2332.00 | 0 |
1990-03-23 | Fracture | 2328.50 | 2332.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 2424 | 0.0 | 0.0 | 0.0 |
1991 | 489 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-10-27 | Lost Circulation | 65.20 | 163.00 |
For data sources see[6]