X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385040316002

Well Details

Well ID: 0385040316002
Loading map...
Location: 00/16-03-038-04W5/2
Location Alias: 00/16-03-38-04 W5M
Location Alias 2: 00/16-03-038-04 W5/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 04
Section: 03
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 16-3-38-4
Operator Name: Cenovus Energy Inc.
License Number: 0141410
License Date: 1989-10-20
License Status: Suspension
Spud Date: 1989-10-27
Final Drill Date: 1989-11-08
Well Total Depth: 2415.00 m
Surface Hole Latitude: 52.243373
Surface Hole Longitude: -114.482538

For data sources see[1][2]

Well History

Date Event
1989-10-20 Obtained License
1989-10-27 Lost Circulation Occurred
1989-10-28 Surface Casing Operation Performed
1989-11-08 Finished Drilling
1989-11-08 Well Mode changed to Drilled and Cased
1989-11-09 Well Log Performed
1989-11-11 Production Casing Operation Performed
1989-11-11 Rig Released
1989-11-23 Well Log Performed
1989-11-25 Perforation Treatment Performed - Jet Perforation
1989-11-25 Well Log Performed
1989-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-30 Perforation Treatment Performed - Fractured
1989-12-02 Well Log Performed
1989-12-03 Perforation Treatment Performed - Jet Perforation
1989-12-08 Well Log Performed
1990-03-17 Well Log Performed
1990-03-18 Perforation Treatment Performed - Cement Squeeze
1990-03-18 Plug Back Performed
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-23 Perforation Treatment Performed - Fractured
1990-03-23 Well Log Performed
1990-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-05 Well Began Production
1990-04-05 Well Fluid changed to Crude Oil
1990-04-05 Well Mode changed to Pumping
1990-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-17 Plug Back Performed
1991-10-17 Well Fluid changed to Crude Oil
1991-10-17 Well Mode changed to Abandoned Zone
1991-10-18 Perforation Treatment Performed - Jet Perforation
1991-10-18 Well Log Performed
1991-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-23 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-25 Perforation 2344.00 2346.00 13
1990-03-24 Acid Treatment 2328.50 2332.00 0
1990-03-25 Acid Treatment 2328.50 2332.00 0
1990-11-07 Acid Treatment 2328.50 2332.00 0
1991-10-17 Packing Device Capped w/Cement 2311.70 2320.00 0
1991-10-18 Perforation 2280.00 2282.00 13
1991-10-19 Acid Treatment 2280.00 2282.00 0
1991-10-23 Fracture 2280.00 2282.00 0
1989-11-27 Acid Treatment 2344.00 2346.00 0
1989-11-28 Acid Treatment 2344.00 2346.00 0
1989-11-30 Fracture 2344.00 2346.00 0
1989-12-03 Perforation 2328.50 2331.50 13
1990-03-18 Cement Squeeze 2328.50 2346.00 0
1990-03-20 Perforation 2328.50 2332.00 13
1990-03-22 Acid Treatment 2328.50 2332.00 0
1990-03-23 Fracture 2328.50 2332.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2424 0.0 0.0 0.0
1991 489 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-10-27 Lost Circulation 65.20 163.00

For data sources see[6]

References