Well ID: 0385040207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.237078,"lon":-114.462411,"icon":""}]} |
Location: 00/07-02-038-04W5/0 | |
Location Alias: 00/07-02-38-04 W5M | |
Location Alias 2: 00/07-02-038-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 04 | |
Section: 02 | |
County/Municipality: Clearwater County | |
Well Name: NAL ACE SYLAKE 7-2-38-4 | |
Operator Name: NAL Resources Limited | |
License Number: 0125200 | |
License Date: 1986-12-17 | |
License Status: RecCertified | |
Spud Date: 1986-12-25 | |
Final Drill Date: 1987-01-25 | |
Well Total Depth: 2912.00 m | |
Surface Hole Latitude: 52.237078 | |
Surface Hole Longitude: -114.462411 |
Date | Event |
---|---|
1986-12-17 | Obtained License |
1986-12-28 | Surface Casing Operation Performed |
1987-01-25 | Finished Drilling |
1987-01-25 | Well Log Performed |
1987-01-25 | Well Mode changed to Drilled and Cased |
1987-01-28 | Drill Stem Test Performed |
1987-01-31 | Production Casing Operation Performed |
1987-01-31 | Rig Released |
1987-02-20 | Perforation Treatment Performed - Jet Perforation |
1987-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-02-22 | Well Began Production |
1987-02-22 | Well Fluid changed to Gas |
1987-02-22 | Well Mode changed to Flowing |
1987-02-28 | Well Fluid changed to Gas |
1987-02-28 | Well Mode changed to Suspended |
1987-03-05 | Well Log Performed |
1987-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-06 | Perforation Treatment Performed - Jet Perforation |
1987-03-09 | Perforation Treatment Performed - Fractured |
1987-06-09 | Well Log Performed |
1987-06-20 | Perforation Treatment Performed - Cement Squeeze |
1987-06-24 | Perforation Treatment Performed - Jet Perforation |
1987-06-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-06-27 | Perforation Treatment Performed - Fractured |
1988-11-12 | Perforation Treatment Performed - Cement Squeeze |
1988-11-12 | Plug Back Performed |
1989-04-13 | Well Fluid changed to Gas |
1989-04-13 | Well Mode changed to Flowing |
1990-07-10 | Well Log Performed |
1990-07-12 | Perforation Treatment Performed - Jet Perforation |
1990-07-12 | Well Log Performed |
1993-10-01 | Well Fluid changed to Gas |
1993-10-01 | Well Mode changed to Suspended |
1999-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-18 | Perforation Treatment Performed - Jet Perforation |
1999-12-18 | Plug Back Performed |
1999-12-18 | Well Fluid changed to Gas |
1999-12-18 | Well Log Performed |
1999-12-18 | Well Mode changed to Abandoned Zone |
2003-07-27 | Perforation Treatment Performed - Jet Perforation |
2003-07-27 | Well Log Performed |
2003-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-08-02 | Plug Back Performed |
2003-08-02 | Well Log Performed |
2004-02-21 | Perforation Treatment Performed - Cement Plug |
2004-02-21 | Plug Back Performed |
2004-03-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-02-20 | Perforation | 2864.50 | 2866.50 | 7 |
1987-06-25 | Acid Wash | 2779.00 | 2800.00 | 0 |
1987-06-27 | Fracture | 2779.00 | 2800.00 | 0 |
1988-11-12 | Cement Squeeze | 2779.00 | 2800.00 | 0 |
1990-07-12 | Perforation | 2856.00 | 2859.00 | 13 |
1999-12-18 | Packing Device Capped w/Cement | 2818.00 | 2826.00 | 0 |
1999-12-18 | Perforation | 2248.50 | 2250.00 | 17 |
2003-07-27 | Perforation | 2335.50 | 2338.00 | 14 |
2003-07-28 | Acid Treatment | 2335.50 | 2338.00 | 0 |
2003-08-02 | Packing Device Capped w/Cement | 2315.10 | 2323.50 | 0 |
2004-02-21 | Cement Plug | 2235.00 | 2243.00 | 0 |
1987-02-20 | Perforation | 2868.00 | 2869.00 | 7 |
1987-02-22 | Acid Treatment | 2864.50 | 2869.00 | 0 |
1987-03-06 | Perforation | 2789.00 | 2807.00 | 3 |
1987-03-06 | Acid Treatment | 2789.00 | 2807.00 | 0 |
1987-03-09 | Fracture | 2789.00 | 2807.00 | 0 |
1987-06-20 | Cement Squeeze | 2789.00 | 2807.00 | 0 |
1987-06-24 | Perforation | 2779.00 | 2782.00 | 7 |
1987-06-24 | Perforation | 2789.00 | 2800.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 71 | 0.0 | 0.0 | 0.0 |
1988 | 24 | 0.0 | 0.0 | 0.0 |
1989 | 3516 | 0.0 | 0.0 | 0.0 |
1990 | 1931 | 0.0 | 0.0 | 0.0 |
1991 | 862 | 0.0 | 0.0 | 0.0 |
For data sources see[5]