If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385033302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.306302,"lon":-114.367671,"icon":""}]} |
Location: 00/02-33-038-03W5/0 | |
Location Alias: 00/02-33-38-03 W5M | |
Location Alias 2: 00/02-33-038-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 03 | |
Section: 33 | |
County/Municipality: Lacombe County | |
Well Name: NAL ACE MEDRIV 2-33-38-3 | |
Operator Name: NAL Resources Limited | |
License Number: 0023360 | |
License Date: 1962-11-19 | |
License Status: Suspension | |
Spud Date: 1962-11-24 | |
Final Drill Date: 1962-12-16 | |
Well Total Depth: 2231.10 m | |
Surface Hole Latitude: 52.306302 | |
Surface Hole Longitude: -114.367671 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-11-19 | Obtained License |
1962-12-11 | Drill Stem Test Performed |
1962-12-14 | Drill Stem Test Performed |
1962-12-16 | Finished Drilling |
1962-12-16 | Well Mode changed to Drilled and Cased |
1962-12-18 | Production Casing Operation Performed |
1962-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-23 | Perforation Treatment Performed - Jet Perforation |
1962-12-24 | Well Began Production |
1962-12-24 | Well Fluid changed to Crude Oil |
1962-12-24 | Well Mode changed to Flowing |
1963-01-30 | Perforation Treatment Performed - Jet Perforation |
1963-01-31 | Perforation Treatment Performed - Cement Squeeze |
1963-02-04 | Perforation Treatment Performed - Jet Perforation |
1963-02-13 | Well Fluid changed to Crude Oil |
1963-02-13 | Well Mode changed to Pumping |
1963-09-29 | Perforation Treatment Performed - Cement Squeeze |
1963-09-29 | Perforation Treatment Performed - Jet Perforation |
1963-10-01 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1963-10-02 | Well Fluid changed to Crude Oil |
1963-10-02 | Well Mode changed to Flowing |
1964-09-02 | Well Fluid changed to Crude Oil |
1964-09-02 | Well Mode changed to Suspended |
1984-02-28 | Well Fluid changed to Crude Oil |
1984-02-28 | Well Mode changed to Pumping |
1985-07-22 | Well Fluid changed to Crude Oil |
1985-07-22 | Well Mode changed to Suspended |
1985-11-07 | Well Fluid changed to Crude Oil |
1985-11-07 | Well Mode changed to Pumping |
1986-12-15 | Well Log Performed |
1986-12-16 | Perforation Treatment Performed - Jet Perforation |
1986-12-16 | Well Log Performed |
1987-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-11-02 | Well Fluid changed to Crude Oil |
1987-11-02 | Well Mode changed to Suspended |
2008-02-02 | Perforation Treatment Performed - Jet Perforation |
2008-02-02 | Well Log Performed |
2008-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-02-17 | Well Fluid changed to Crude Oil |
2008-02-17 | Well Mode changed to Pumping |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-12-23 | Perforation | 2200.70 | 2202.50 | 7 |
1987-03-07 | Acid Treatment | 2196.90 | 2208.50 | 0 |
2008-02-02 | Perforation | 2195.40 | 2202.40 | 17 |
2008-02-02 | Perforation | 2194.50 | 2195.40 | 17 |
2008-02-02 | Perforation | 2185.60 | 2191.40 | 17 |
2008-02-06 | Acid Treatment | 2185.60 | 2202.50 | 0 |
1962-12-23 | Acid Treatment | 2200.70 | 2202.50 | 0 |
1963-01-30 | Perforation | 2207.40 | 2208.00 | 13 |
1963-01-31 | Cement Squeeze | 2200.70 | 2208.00 | 0 |
1963-02-04 | Perforation | 2199.40 | 2200.40 | 7 |
1963-09-29 | Perforation | 2194.30 | 2194.60 | 13 |
1963-09-29 | Cement Squeeze | 2194.30 | 2200.40 | 0 |
1963-10-01 | Hydra Jet Perforation | 2197.50 | 2208.50 | 0 |
1986-12-16 | Perforation | 2196.90 | 2198.70 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 3649 | 0.0 | 0.0 | 0.0 |
1985 | 1185 | 0.0 | 0.0 | 0.0 |
1986 | 4698 | 0.0 | 0.0 | 0.0 |
1987 | 6189 | 0.0 | 0.0 | 0.0 |
2008 | 5403 | 0.0 | 0.0 | 0.0 |
For data sources see[5]