X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032601000

Well Details

Well ID: 0385032601000
Loading map...
Location: 00/01-26-038-03W5/0
Location Alias: 00/01-26-38-03 W5M
Location Alias 2: 00/01-26-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 26
County/Municipality: Lacombe County
Well Name: BEC SYLAKE 1-26-38-3
Operator Name: Bonavista Energy Corporation
License Number: 0078825
License Date: 1979-10-24
License Status: RecCertified
Spud Date: 1979-10-30
Final Drill Date: 1979-11-06
Well Total Depth: 1955.00 m
Surface Hole Latitude: 52.292341
Surface Hole Longitude: -114.314630

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-24 Obtained License
1979-11-06 Finished Drilling
1979-11-06 Well Mode changed to Drilled and Cased
1979-11-07 Drill Stem Test Performed
1979-11-09 Production Casing Operation Performed
1979-11-27 Perforation Treatment Performed - Jet Perforation
1979-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-21 Perforation Treatment Performed - Fractured
1980-02-10 Well Began Production
1980-02-10 Well Fluid changed to Crude Oil
1980-02-10 Well Mode changed to Pumping
1986-12-31 Well Fluid changed to Crude Oil
1986-12-31 Well Mode changed to Suspended
1995-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-04 Perforation Treatment Performed - Jet Perforation
1995-10-04 Perforation Treatment Performed - Remedial Casing
1995-10-04 Plug Back Performed
1995-10-04 Well Log Performed
1995-10-05 Well Abandoned
1995-10-05 Well Fluid changed to Crude Oil
1995-10-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-27 Perforation 1912.20 1913.20 14
1979-11-29 Acid Treatment 1912.20 1913.20 0
1980-01-21 Fracture 1912.20 1913.20 0
1995-10-04 Packing Device Capped w/Cement 1892.00 1900.00 0
1995-10-04 Perforation 402.00 402.30 13
1995-10-04 Remedial Casing Cementing 402.00 402.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 5893 0.0 0.0 0.0
1981 2750 0.0 0.0 0.0
1982 2201 0.0 0.0 0.0
1983 4112 0.0 0.0 0.0
1984 7009 0.0 0.0 0.0
1985 7196 0.0 0.0 0.0
1986 1532 0.0 0.0 0.0

For data sources see[5]

References