X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385032104000

Well Details

Well ID: 0385032104000
Loading map...
Location: 00/04-21-038-03W5/0
Location Alias: 00/04-21-38-03 W5M
Location Alias 2: 00/04-21-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 21
County/Municipality: Lacombe County
Well Name: CVE SYLAKE 4-21-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0023554
License Date: 1962-12-21
License Status: RecCertified
Spud Date: 1962-12-28
Final Drill Date: 1963-01-09
Well Total Depth: 2276.60 m
Surface Hole Latitude: 52.277212
Surface Hole Longitude: -114.379415

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-21 Obtained License
1963-01-09 Finished Drilling
1963-01-09 Well Mode changed to Drilled and Cased
1963-01-10 Drill Stem Test Performed
1963-01-13 Production Casing Operation Performed
1963-01-15 Perforation Treatment Performed - Bullet Perforation
1963-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-16 Perforation Treatment Performed - Cement Squeeze
1963-02-19 Perforation Treatment Performed - Bullet Perforation
1963-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-25 Perforation Treatment Performed - Jet Perforation
1963-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-01 Well Began Production
1963-03-01 Well Fluid changed to Crude Oil
1963-03-01 Well Mode changed to Flowing
1964-11-23 Well Fluid changed to Crude Oil
1964-11-23 Well Mode changed to Pumping
1976-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-27 Well Log Performed
1979-07-05 Perforation Treatment Performed - Jet Perforation
1979-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1989-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-23 Well Log Performed
1998-03-20 Well Fluid changed to Crude Oil
1998-03-20 Well Mode changed to Suspended
2003-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-15 Plug Back Performed
2003-01-15 Well Fluid changed to Crude Oil
2003-01-15 Well Log Performed
2003-01-15 Well Mode changed to Abandoned Zone
2006-01-11 Perforation Treatment Performed - Jet Perforation
2006-01-11 Well Log Performed
2006-01-13 Perforation Treatment Performed - Remedial Casing
2006-01-14 Perforation Treatment Performed - Jet Perforation
2006-01-15 Perforation Treatment Performed - Remedial Casing
2006-01-16 Perforation Treatment Performed - Jet Perforation
2006-01-16 Well Log Performed
2006-01-17 Perforation Treatment Performed - Remedial Casing
2006-01-18 Perforation Treatment Performed - Jet Perforation
2006-01-18 Well Log Performed
2006-01-19 Perforation Treatment Performed - Remedial Casing
2006-01-24 Perforation Treatment Performed - Jet Perforation
2006-01-24 Well Log Performed
2006-01-25 Perforation Treatment Performed - Remedial Casing
2006-01-26 Perforation Treatment Performed - Jet Perforation
2006-01-26 Perforation Treatment Performed - Remedial Casing
2006-01-26 Well Log Performed
2006-01-27 Perforation Treatment Performed - Remedial Casing
2006-01-27 Well Log Performed
2006-07-20 Well Log Performed
2006-10-13 Well Abandoned
2006-10-13 Well Fluid changed to Crude Oil
2006-10-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-15 Bullet Perforation 2235.10 2236.00 7
1979-07-05 Perforation 2235.40 2238.50 13
1979-07-06 Acid Wash 2228.10 2240.00 0
1989-07-15 Acid Treatment 2228.10 2240.00 0
1989-11-09 Acid Treatment 2228.10 2229.60 0
2003-01-15 Packing Device Capped w/Cement 2212.00 2220.00 0
2006-01-11 Perforation 1316.00 1317.00 14
2006-01-11 Perforation 1130.00 1131.00 14
2006-01-13 Remedial Casing Cementing 1316.00 1317.00 0
2006-01-13 Remedial Casing Cementing 1130.00 1131.00 0
2006-01-14 Perforation 1090.00 1091.00 14
1963-01-15 Bullet Perforation 2236.60 2238.10 7
2006-01-14 Perforation 560.00 561.00 14
2006-01-15 Remedial Casing Cementing 1090.00 1091.00 0
2006-01-16 Perforation 1040.00 1041.00 14
2006-01-17 Remedial Casing Cementing 1040.00 1041.00 0
2006-01-18 Perforation 830.00 831.00 14
2006-01-19 Remedial Casing Cementing 830.00 831.00 0
2006-01-24 Perforation 596.00 597.00 14
2006-01-25 Remedial Casing Cementing 596.00 597.00 0
2006-01-26 Remedial Casing Cementing 560.00 561.00 0
2006-01-26 Perforation 279.00 280.00 14
1963-01-16 Acid Treatment 2235.10 2238.10 0
2006-01-27 Remedial Casing Cementing 279.00 280.00 0
1963-02-16 Cement Squeeze 2235.10 2238.10 0
1963-02-19 Bullet Perforation 2239.40 2240.00 7
1963-02-20 Acid Treatment 2239.40 2240.00 0
1963-02-25 Perforation 2228.10 2229.60 7
1963-02-26 Acid Treatment 2228.10 2229.60 0
1976-06-05 Acid Treatment 2228.10 2240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8428 0.0 0.0 0.0
1968 7000 0.0 0.0 0.0
1969 7751 0.0 0.0 0.0
1970 8592 0.0 0.0 0.0
1971 8389 0.0 0.0 0.0
1972 8444 0.0 0.0 0.0
1973 8345 0.0 0.0 0.0
1974 8660 0.0 0.0 0.0
1975 8036 0.0 0.0 0.0
1976 7925 0.0 0.0 0.0
1977 8357 0.0 0.0 0.0
1978 8732 0.0 0.0 0.0
1979 7523 0.0 0.0 0.0
1980 8465 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 8225 0.0 0.0 0.0
1983 8459 0.0 0.0 0.0
1984 8771 0.0 0.0 0.0
1985 8088 0.0 0.0 0.0
1986 8272 0.0 0.0 0.0
1987 6995 0.0 0.0 0.0
1988 8118 0.0 0.0 0.0
1989 7427 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8732 0.0 0.0 0.0
1992 7999 0.0 0.0 0.0
1993 7943 0.0 0.0 0.0
1994 8441 0.0 0.0 0.0
1995 8318 0.0 0.0 0.0
1996 7841 0.0 0.0 0.0
1997 8532 0.0 0.0 0.0
1998 1896 0.0 0.0 0.0

For data sources see[5]

References