X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030602000

Well Details

Well ID: 0385030602000
Loading map...
Location: 00/02-06-038-03W5/0
Location Alias: 00/02-06-38-03 W5M
Location Alias 2: 00/02-06-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 06
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 2-6-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0024044
License Date: 1963-04-11
License Status: Abandoned
Spud Date: 1963-04-29
Final Drill Date: 1963-05-17
Well Total Depth: 2316.50 m
Surface Hole Latitude: 52.233669
Surface Hole Longitude: -114.415295

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-04-11 Obtained License
1963-05-17 Drill Stem Test Performed
1963-05-17 Finished Drilling
1963-05-17 Well Mode changed to Drilled and Cased
1963-05-18 Drill Stem Test Performed
1963-05-19 Drill Stem Test Performed
1963-05-21 Production Casing Operation Performed
1963-05-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-27 Perforation Treatment Performed - Fractured
1963-06-04 Well Began Production
1963-06-04 Well Fluid changed to Crude Oil
1963-06-04 Well Mode changed to Flowing
1975-06-11 Well Fluid changed to Crude Oil
1975-06-11 Well Mode changed to Pumping
1987-09-02 Well Log Performed
1987-09-03 Perforation Treatment Performed - Jet Perforation
1990-10-22 Perforation Treatment Performed - Jet Perforation
1990-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-02 Perforation Treatment Performed - Fractured
1993-04-02 Perforation Treatment Performed - Jet Perforation
1993-04-02 Well Fluid changed to Crude Oil
1993-04-02 Well Mode changed to Pumping
1993-05-01 Well Fluid changed to Crude Oil
1993-05-01 Well Mode changed to Suspended
2009-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-18 Plug Back Performed
2009-08-18 Well Fluid changed to Crude Oil
2009-08-18 Well Mode changed to Abandoned Zone
2009-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-19 Perforation Treatment Performed - Jet Perforation
2009-08-19 Plug Back Performed
2009-08-19 Well Log Performed
2009-08-20 Perforation Treatment Performed - Remedial Casing
2009-08-21 Perforation Treatment Performed - Jet Perforation
2009-08-21 Perforation Treatment Performed - Remedial Casing
2009-08-21 Well Log Performed
2009-08-24 Perforation Treatment Performed - Jet Perforation
2009-08-24 Perforation Treatment Performed - Remedial Casing
2009-08-24 Well Log Performed
2009-08-25 Perforation Treatment Performed - Jet Perforation
2009-08-25 Perforation Treatment Performed - Remedial Casing
2009-08-26 Perforation Treatment Performed - Remedial Casing
2009-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-27 Perforation Treatment Performed - Jet Perforation
2009-08-27 Perforation Treatment Performed - Remedial Casing
2009-08-27 Well Log Performed
2009-09-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-22 Hydra Jet Perforation 2233.60 2233.60 0
1993-04-02 Fracture 1989.10 2005.60 0
2009-08-18 Packing Device Capped w/Cement 2208.00 2216.00 0
2009-08-19 Packing Device Capped w/Cement 1978.00 1986.00 0
2009-08-19 Perforation 1494.00 1495.00 17
2009-08-19 Perforation 1345.00 1346.00 17
2009-08-20 Remedial Casing Cementing 1494.00 1495.00 0
2009-08-20 Remedial Casing Cementing 1345.00 1346.00 0
2009-08-21 Perforation 1053.50 1054.50 17
2009-08-21 Remedial Casing Cementing 1053.50 1054.50 0
2009-08-24 Perforation 544.00 545.00 17
1963-05-23 Acid Treatment 2233.60 2233.60 0
2009-08-24 Perforation 480.00 481.00 17
2009-08-24 Remedial Casing Cementing 544.00 545.00 0
2009-08-24 Remedial Casing Cementing 480.00 481.00 0
2009-08-25 Perforation 453.00 454.00 17
2009-08-25 Perforation 380.00 381.00 17
2009-08-25 Remedial Casing Cementing 453.00 454.00 0
2009-08-26 Remedial Casing Cementing 380.00 381.00 0
2009-08-27 Perforation 346.00 347.00 17
2009-08-27 Perforation 321.00 322.00 17
2009-08-27 Packing Device Capped w/Cement 332.00 340.00 0
1963-05-27 Fracture 2233.60 2233.60 0
2009-08-27 Packing Device Capped w/Cement 305.00 313.00 0
2009-08-27 Perforation 285.00 286.00 17
2009-08-27 Remedial Casing Cementing 285.00 286.00 0
1987-09-03 Perforation 2232.70 2235.40 13
1990-10-22 Perforation 2223.40 2227.00 13
1990-10-22 Perforation 2232.30 2235.40 13
1990-10-25 Acid Treatment 2223.40 2235.40 0
1993-04-02 Perforation 1989.10 1995.20 20
1993-04-02 Perforation 1999.50 2005.60 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 538 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 4805 0.0 0.0 0.0
1970 7129 0.0 0.0 0.0
1971 8294 0.0 0.0 0.0
1972 7166 0.0 0.0 0.0
1973 8752 0.0 0.0 0.0
1974 8613 0.0 0.0 0.0
1975 8645 0.0 0.0 0.0
1976 8073 0.0 0.0 0.0
1977 8495 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 8553 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8416 0.0 0.0 0.0
1982 8700 0.0 0.0 0.0
1983 8522 0.0 0.0 0.0
1984 8484 0.0 0.0 0.0
1985 8590 0.0 0.0 0.0
1986 8540 0.0 0.0 0.0
1987 7701 0.0 0.0 0.0
1988 8752 0.0 0.0 0.0
1989 8711 0.0 0.0 0.0
1990 1892 0.0 0.0 0.0

For data sources see[5]

References