X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030506004

Well Details

Well ID: 0385030506004
Loading map...
Location: 00/06-05-038-03W5/4
Location Alias: 00/06-05-38-03 W5M
Location Alias 2: 00/06-05-038-03 W5/04
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 05
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 6-5-38-3
Operator Name: Cenovus Energy Inc.
License Number: 0150817
License Date: 1991-11-29
License Status: Suspension
Spud Date: 1991-12-03
Final Drill Date: 1991-12-16
Well Total Depth: 2298.00 m
Surface Hole Latitude: 52.237506
Surface Hole Longitude: -114.398760

For data sources see[1][2]

Well History

Date Event
1991-11-29 Obtained License
1991-12-03 Surface Casing Operation Performed
1991-12-08 Drill Stem Test Performed
1991-12-11 Drill Stem Test Performed
1991-12-16 Finished Drilling
1991-12-16 Well Log Performed
1991-12-16 Well Mode changed to Drilled and Cased
1991-12-17 Drill Stem Test Performed
1991-12-17 Well Log Performed
1991-12-18 Drill Stem Test Performed
1991-12-19 Drill Stem Test Performed
1991-12-20 Drill Stem Test Performed
1991-12-21 Production Casing Operation Performed
1991-12-21 Rig Released
1992-01-21 Well Log Performed
1992-01-22 Perforation Treatment Performed - Jet Perforation
1992-01-24 Perforation Treatment Performed - Fractured
1992-02-03 Well Log Performed
1992-09-20 Well Log Performed
1992-09-22 Perforation Treatment Performed - Fractured
1992-09-22 Perforation Treatment Performed - Jet Perforation
1992-09-24 Perforation Treatment Performed - Fractured
1992-09-24 Perforation Treatment Performed - Jet Perforation
1992-09-24 Well Log Performed
1992-09-30 Perforation Treatment Performed - Fractured
1993-09-29 Perforation Treatment Performed - Cement Squeeze
1993-09-29 Plug Back Performed
1993-10-04 Perforation Treatment Performed - Cement Squeeze
1993-10-04 Plug Back Performed
1996-01-08 Well Log Performed
1996-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-09 Perforation Treatment Performed - Jet Perforation
1996-01-09 Plug Back Performed
1996-01-10 Perforation Treatment Performed - Fractured
1996-01-27 Well Began Production
1996-01-27 Well Fluid changed to Crude Oil
1996-01-27 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-22 Perforation 2225.50 2229.50 20
1993-09-29 Cement Squeeze 1973.00 1990.00 0
1993-10-04 Cement Squeeze 2173.00 2186.00 0
1996-01-09 Packing Device Capped w/Cement 1707.00 1715.00 0
1996-01-09 Perforation 1691.50 1697.50 17
1996-01-10 Fracture 1691.50 1697.50 0
1992-01-24 Fracture 2225.50 2229.50 0
1992-09-22 Perforation 2173.00 2177.00 18
1992-09-22 Perforation 2179.00 2182.00 18
1992-09-22 Perforation 2183.50 2186.00 18
1992-09-22 Fracture 2173.00 2186.00 0
1992-09-24 Perforation 1973.00 1990.00 18
1992-09-24 Fracture 1975.00 1989.60 0
1992-09-30 Fracture 1973.00 1990.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 7730 0.0 0.0 0.0
1997 8499 0.0 0.0 0.0
1998 7913 0.0 0.0 0.0
1999 8579 0.0 0.0 0.0
2000 8651 0.0 0.0 0.0
2001 8645 0.0 0.0 0.0
2002 8682 0.0 0.0 0.0
2003 8208 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8584 0.0 0.0 0.0
2006 8441 0.0 0.0 0.0
2007 8687 0.0 0.0 0.0
2008 8082 0.0 0.0 0.0
2009 8039 0.0 0.0 0.0
2010 8324 0.0 0.0 0.0
2011 8213 0.0 0.0 0.0
2012 8372 0.0 0.0 0.0
2013 8704 0.0 0.0 0.0
2014 8266 0.0 0.0 0.0
2015 7408 0.0 0.0 0.0
2016 5981 0.0 0.0 0.0

For data sources see[5]

References