X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385030412000

Well Details

Well ID: 0385030412000
Loading map...
Location: 00/12-04-038-03W5/0
Location Alias: 00/12-04-38-03 W5M
Location Alias 2: 00/12-04-038-03 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 03
Section: 04
County/Municipality: Red Deer County
Well Name: ANDERSON SYLAKE 12-4-38-3
Operator Name: InPlay Oil Corp.
License Number: 0413822
License Date: 2009-11-10
License Status: Abandoned
Spud Date: 2009-11-25
Final Drill Date: 2009-12-15
Well Total Depth: 947.00 m
Surface Hole Latitude: 52.241835
Surface Hole Longitude: -114.377632

For data sources see[1][2]

Well History

Date Event
2009-11-10 Obtained License
2009-11-26 Surface Casing Operation Performed
2009-12-15 Finished Drilling
2009-12-15 Production Casing Operation Performed
2009-12-15 Rig Released
2009-12-15 Well Mode changed to Drilled and Cased
2009-12-19 Well Log Performed
2010-01-07 Perforation Treatment Performed - Jet Perforation
2010-01-07 Well Log Performed
2010-01-16 Perforation Treatment Performed - Fractured
2010-03-16 Well Began Production
2010-03-16 Well Fluid changed to Gas
2010-03-16 Well Mode changed to Flowing
2015-02-01 Well Fluid changed to Gas
2015-02-01 Well Mode changed to Suspended
2016-08-18 Well Log Performed
2016-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-06 Plug Back Performed
2016-09-06 Well Fluid changed to Gas
2016-09-06 Well Log Performed
2016-09-06 Well Mode changed to Abandoned Zone
2016-09-13 Well Abandoned
2016-09-13 Well Fluid changed to Gas
2016-09-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-07 Perforation 894.00 895.00 20
2010-01-07 Perforation 508.50 509.50 20
2010-01-07 Perforation 489.00 490.00 20
2010-01-16 Fracture 894.00 895.00 0
2010-01-16 Fracture 508.50 509.50 0
2010-01-16 Fracture 489.00 490.00 0
2016-09-06 Packing Device Capped w/Cement 877.00 885.00 0
2016-09-06 Packing Device Capped w/Cement 472.00 480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6625 0.0 0.0 0.0
2011 8190 0.0 0.0 0.0
2012 7692 0.0 0.0 0.0
2013 3128 0.0 0.0 0.0
2014 7069 0.0 0.0 0.0
2015 685 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References