X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0385012806020

Well Details

Well ID: 0385012806020
Loading map...
Location: 02/06-28-038-01W5/0
Location Alias: 02/06-28-38-01 W5M
Location Alias 2: 02/06-28-038-01 W5/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 5
Range: 01
Section: 28
County/Municipality: Sylvan Lake
Well Name: CVE SYLAKE 6-28-38-1
Operator Name: Cenovus Energy Inc.
License Number: 0107451
License Date: 1984-06-04
License Status: Abandoned
Spud Date: 1984-06-12
Final Drill Date: 1984-06-19
Well Total Depth: 1862.00 m
Surface Hole Latitude: 52.294219
Surface Hole Longitude: -114.089495

For data sources see[1][2]

Well History

Date Event
1984-06-04 Obtained License
1984-06-13 Surface Casing Operation Performed
1984-06-19 Finished Drilling
1984-06-19 Well Mode changed to Drilled and Cased
1984-06-20 Well Log Performed
1984-06-21 Production Casing Operation Performed
1984-06-21 Rig Released
1984-07-14 Perforation Treatment Performed - Jet Perforation
1984-07-15 Perforation Treatment Performed - Fractured
1984-07-22 Well Began Production
1984-07-22 Well Fluid changed to Crude Oil
1984-07-22 Well Mode changed to Pumping
1989-10-01 Well Fluid changed to Crude Oil
1989-10-01 Well Mode changed to Suspended
1992-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-05 Perforation Treatment Performed - Jet Perforation
1992-09-05 Plug Back Performed
1992-09-06 Perforation Treatment Performed - Remedial Casing
1992-09-06 Well Abandoned
1992-09-06 Well Fluid changed to Crude Oil
1992-09-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-14 Perforation 1821.00 1823.00 13
1984-07-14 Perforation 1825.00 1828.50 13
1984-07-14 Perforation 1829.50 1832.00 13
1984-07-14 Perforation 1833.00 1834.50 13
1984-07-14 Perforation 1835.50 1837.00 13
1984-07-15 Fracture 1821.00 1837.00 0
1992-09-05 Packing Device Capped w/Cement 1810.00 1818.00 0
1992-09-05 Perforation 394.00 395.00 13
1992-09-06 Remedial Casing Cementing 394.00 395.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 2441 0.0 0.0 0.0
1985 6353 0.0 0.0 0.0
1986 7516 0.0 0.0 0.0
1987 1464 0.0 0.0 0.0
1988 7803 0.0 0.0 0.0
1989 2499 0.0 0.0 0.0

For data sources see[5]

References