If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384253105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.30722,"lon":-113.57863,"icon":""}]} |
Location: 00/05-31-038-25W4/0 | |
Location Alias: 00/05-31-38-25 W4M | |
Location Alias 2: 00/05-31-038-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 5-31-38-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0359579 | |
License Date: 2006-06-28 | |
License Status: Issued | |
Spud Date: 2006-07-04 | |
Final Drill Date: 2006-07-06 | |
Well Total Depth: 1132.00 m | |
Surface Hole Latitude: 52.307220 | |
Surface Hole Longitude: -113.578630 |
Date | Event |
---|---|
2006-06-28 | Obtained License |
2006-07-03 | Surface Casing Operation Performed |
2006-07-04 | Direction Drilling Operation Performed - Deviate |
2006-07-06 | Finished Drilling |
2006-07-06 | Production Casing Operation Performed |
2006-07-06 | Rig Released |
2006-07-06 | Well Mode changed to Drilled and Cased |
2006-07-13 | Well Log Performed |
2006-07-20 | Perforation Treatment Performed - Jet Perforation |
2006-07-27 | Perforation Treatment Performed - Jet Perforation |
2006-08-15 | Perforation Treatment Performed - Fractured |
2006-08-17 | Well Fluid changed to Gas |
2006-08-17 | Well Mode changed to Testing |
2007-01-30 | Well Began Production |
2007-01-30 | Well Fluid changed to Gas |
2007-01-30 | Well Mode changed to Flowing |
2007-09-04 | Perforation Treatment Performed - Jet Perforation |
2007-10-15 | Perforation Treatment Performed - Fractured |
2008-01-01 | Well Fluid changed to Gas |
2008-01-01 | Well Mode changed to Suspended |
2008-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-07 | Plug Back Performed |
2008-01-10 | Perforation Treatment Performed - Jet Perforation |
2008-01-11 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-07-04 | 206.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-07-20 | Perforation | 993.50 | 994.50 | 7 |
2008-01-07 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
2008-01-07 | Packing Device Capped w/Cement | 792.00 | 800.00 | 0 |
2008-01-10 | Perforation | 368.40 | 369.40 | 7 |
2008-01-10 | Perforation | 386.20 | 387.20 | 7 |
2008-01-10 | Perforation | 523.70 | 524.70 | 7 |
2008-01-10 | Perforation | 531.70 | 532.70 | 7 |
2008-01-10 | Perforation | 544.70 | 546.70 | 7 |
2008-01-10 | Perforation | 549.70 | 550.70 | 7 |
2008-01-10 | Perforation | 572.00 | 573.00 | 7 |
2008-01-10 | Perforation | 585.70 | 586.70 | 7 |
2006-07-20 | Perforation | 962.50 | 963.50 | 7 |
2008-01-10 | Perforation | 587.60 | 588.60 | 7 |
2008-01-10 | Perforation | 614.00 | 617.50 | 7 |
2008-01-10 | Perforation | 619.30 | 620.80 | 7 |
2008-01-10 | Perforation | 629.50 | 630.50 | 7 |
2008-01-10 | Perforation | 632.20 | 633.20 | 7 |
2008-01-10 | Perforation | 651.00 | 652.00 | 7 |
2008-01-10 | Perforation | 653.40 | 654.40 | 7 |
2008-01-10 | Perforation | 654.90 | 655.90 | 7 |
2008-01-10 | Perforation | 661.00 | 662.00 | 7 |
2008-01-10 | Perforation | 662.50 | 663.50 | 7 |
2006-07-20 | Perforation | 327.70 | 328.70 | 7 |
2008-01-10 | Perforation | 664.00 | 665.00 | 7 |
2008-01-10 | Perforation | 667.00 | 668.00 | 7 |
2008-01-10 | Perforation | 677.20 | 678.20 | 7 |
2008-01-10 | Perforation | 679.00 | 680.00 | 7 |
2008-01-10 | Perforation | 694.20 | 695.20 | 7 |
2008-01-10 | Perforation | 697.70 | 698.70 | 7 |
2008-01-10 | Perforation | 699.50 | 700.50 | 7 |
2008-01-10 | Perforation | 701.00 | 702.00 | 7 |
2008-01-10 | Perforation | 723.50 | 724.50 | 7 |
2008-01-11 | Fracture | 213.50 | 724.50 | 0 |
2006-07-27 | Perforation | 213.50 | 215.50 | 14 |
2006-07-27 | Perforation | 216.60 | 218.10 | 14 |
2006-08-15 | Fracture | 216.60 | 994.50 | 0 |
2007-09-04 | Perforation | 803.00 | 806.00 | 13 |
2007-10-15 | Fracture | 803.00 | 806.00 | 0 |
2008-01-07 | Packing Device Capped w/Cement | 977.00 | 985.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 120 | 0.0 | 0.0 | 0.0 |
2007 | 6311 | 0.0 | 0.0 | 0.0 |
For data sources see[6]