X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384251905000

Well Details

Well ID: 0384251905000
Loading map...
Location: 00/05-19-038-25W4/0
Location Alias: 00/05-19-38-25 W4M
Location Alias 2: 00/05-19-038-25 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 19
County/Municipality: Lacombe County
Well Name: MORTON ESTATE NO. 5-19
Operator Name: ExxonMobil Canada Resources Company
License Number: 0008155
License Date: 1954-06-23
License Status: RecCertified
Spud Date: 1954-06-25
Final Drill Date: 1954-07-02
Well Total Depth: 1528.60 m
Surface Hole Latitude: 52.279206
Surface Hole Longitude: -113.572689

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-23 Obtained License
1954-07-02 Finished Drilling
1954-07-02 Well Mode changed to Drilled and Cased
1954-07-03 Production Casing Operation Performed
1954-07-05 Drill Stem Test Performed
1954-07-05 Perforation Treatment Performed - Bullet Perforation
1954-07-05 Perforation Treatment Performed - Jet Perforation
1954-07-10 Well Began Production
1954-07-10 Well Fluid changed to Crude Oil
1954-07-10 Well Mode changed to Pumping
1957-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-12-01 Well Began Injection
1957-12-01 Well Fluid changed to Water
1957-12-01 Well Type changed to Injection
1958-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-14 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-27 Perforation Treatment Performed - Cement Plug
1964-07-30 Well Abandoned
1964-07-30 Well Fluid changed to Water
1964-07-30 Well Mode changed to Abandoned
1964-07-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-05 Perforation 1510.30 1512.40 13
1954-07-05 Bullet Perforation 1510.30 1512.40 13
1954-07-05 Perforation 1504.80 1506.90 13
1954-07-05 Bullet Perforation 1504.80 1506.90 13
1957-10-17 Acid Treatment 1504.80 1512.40 0
1958-01-09 Acid Treatment 1504.80 1512.40 0
1958-06-30 Acid Treatment 1504.80 1512.40 0
1958-07-14 Acid Wash 1504.80 1512.40 0
1964-07-27 Cement Plug 1489.60 1512.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References