If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384251415002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.273532,"lon":-113.468251,"icon":""}]} |
Location: 00/15-14-038-25W4/2 | |
Location Alias: 00/15-14-38-25 W4M | |
Location Alias 2: 00/15-14-038-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 25 | |
Section: 14 | |
County/Municipality: Lacombe County | |
Well Name: CANSEARCH JOFFRE 15-14-38-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0401825 | |
License Date: 2008-10-03 | |
License Status: Issued | |
Spud Date: 2008-10-05 | |
Final Drill Date: 2008-10-08 | |
Well Total Depth: 885.80 m | |
Surface Hole Latitude: 52.273532 | |
Surface Hole Longitude: -113.468251 |
Date | Event |
---|---|
2008-10-03 | Obtained License |
2008-10-06 | Surface Casing Operation Performed |
2008-10-08 | Finished Drilling |
2008-10-08 | Production Casing Operation Performed |
2008-10-08 | Rig Released |
2008-10-08 | Well Log Performed |
2008-10-08 | Well Mode changed to Drilled and Cased |
2008-10-26 | Well Log Performed |
2008-10-27 | Perforation Treatment Performed - Jet Perforation |
2008-10-27 | Well Log Performed |
2008-11-05 | Perforation Treatment Performed - Fractured |
2013-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-03-06 | Perforation Treatment Performed - Jet Perforation |
2013-03-06 | Plug Back Performed |
2013-03-07 | Perforation Treatment Performed - Jet Perforation |
2013-03-07 | Well Log Performed |
2013-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-12 | Well Began Production |
2013-03-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2013-03-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-27 | Perforation | 857.10 | 861.50 | 17 |
2013-03-06 | Perforation | 543.50 | 545.40 | 13 |
2013-03-06 | Perforation | 534.50 | 535.80 | 13 |
2013-03-06 | Perforation | 530.00 | 531.00 | 13 |
2013-03-06 | Perforation | 512.00 | 513.00 | 13 |
2013-03-06 | Perforation | 505.00 | 506.00 | 13 |
2013-03-06 | Perforation | 503.50 | 504.50 | 13 |
2013-03-06 | Perforation | 495.90 | 497.60 | 13 |
2013-03-06 | Perforation | 487.90 | 488.50 | 13 |
2013-03-06 | Perforation | 434.70 | 435.90 | 13 |
2013-03-06 | Perforation | 432.80 | 433.90 | 13 |
2008-11-05 | Fracture | 857.10 | 861.50 | 0 |
2013-03-06 | Perforation | 421.40 | 422.10 | 13 |
2013-03-07 | Perforation | 415.50 | 416.50 | 13 |
2013-03-07 | Perforation | 343.70 | 344.20 | 13 |
2013-03-07 | Perforation | 309.20 | 310.20 | 13 |
2013-03-07 | Perforation | 294.00 | 295.00 | 9 |
2013-03-07 | Perforation | 287.00 | 287.50 | 9 |
2013-03-07 | Perforation | 201.60 | 202.90 | 9 |
2013-03-08 | Multi-Stage Fracture | 565.00 | 570.00 | 0 |
2013-03-08 | Multi-Stage Fracture | 557.10 | 558.90 | 0 |
2013-03-08 | Multi-Stage Fracture | 543.30 | 549.60 | 0 |
2013-03-06 | Packing Device Capped w/Cement | 840.00 | 848.00 | 0 |
2013-03-08 | Multi-Stage Fracture | 530.00 | 535.80 | 0 |
2013-03-08 | Multi-Stage Fracture | 512.00 | 513.00 | 0 |
2013-03-08 | Multi-Stage Fracture | 503.50 | 506.00 | 0 |
2013-03-08 | Multi-Stage Fracture | 495.90 | 497.60 | 0 |
2013-03-08 | Multi-Stage Fracture | 487.90 | 488.50 | 0 |
2013-03-08 | Multi-Stage Fracture | 432.80 | 435.90 | 0 |
2013-03-08 | Multi-Stage Fracture | 421.40 | 422.10 | 0 |
2013-03-08 | Multi-Stage Fracture | 415.50 | 416.50 | 0 |
2013-03-08 | Multi-Stage Fracture | 343.70 | 344.20 | 0 |
2013-03-08 | Multi-Stage Fracture | 309.20 | 310.20 | 0 |
2013-03-06 | Perforation | 569.00 | 570.00 | 13 |
2013-03-08 | Multi-Stage Fracture | 294.00 | 295.00 | 0 |
2013-03-08 | Multi-Stage Fracture | 287.00 | 287.50 | 0 |
2013-03-08 | Multi-Stage Fracture | 201.60 | 202.90 | 0 |
2013-03-06 | Perforation | 567.00 | 568.00 | 13 |
2013-03-06 | Perforation | 565.00 | 566.00 | 13 |
2013-03-06 | Perforation | 557.10 | 558.90 | 13 |
2013-03-06 | Perforation | 548.60 | 549.60 | 13 |
2013-03-06 | Perforation | 543.30 | 545.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7120 | 0.0 | 0.0 | 0.0 |
2014 | 8458 | 0.0 | 0.0 | 0.0 |
2015 | 8584 | 0.0 | 0.0 | 0.0 |
2016 | 8383 | 0.0 | 0.0 | 0.0 |
2017 | 6518 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8684 | 0.0 | 0.0 | 0.0 |
2020 | 1847 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-06 | No Incident Encountered | 0.00 | 0.00 |
2013-03-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]