X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384242303000

Well Details

Well ID: 0384242303000
Loading map...
Location: 00/03-23-038-24W4/0
Location Alias: 00/03-23-38-24 W4M
Location Alias 2: 00/03-23-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY HAYNES 3-23-38-24
Operator Name: Enhance Energy Inc.
License Number: 0304061
License Date: 2004-02-13
License Status: Suspension
Spud Date: 2004-02-28
Final Drill Date: 2004-03-13
Well Total Depth: 2110.00 m
Surface Hole Latitude: 52.276725
Surface Hole Longitude: -113.329242

For data sources see[1][2]

Well History

Date Event
2004-02-13 Obtained License
2004-02-29 Surface Casing Operation Performed
2004-03-06 Well Log Performed
2004-03-07 Drill Stem Test Performed
2004-03-09 Intermediate Casing Operation Performed
2004-03-12 Well Log Performed
2004-03-13 Finished Drilling
2004-03-13 Well Log Performed
2004-03-13 Well Mode changed to Drilled and Cased
2004-03-14 Liner Casing Operation Performed
2004-03-14 Rig Released
2004-03-25 Well Log Performed
2004-03-27 Perforation Treatment Performed - Jet Perforation
2004-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-29 Plug Back Performed
2004-03-29 Well Log Performed
2004-03-29 Well Mode changed to Abandoned Zone
2004-03-31 Perforation Treatment Performed - Jet Perforation
2004-03-31 Well Log Performed
2004-04-01 Well Log Performed
2004-04-03 Perforation Treatment Performed - Jet Perforation
2004-04-13 Perforation Treatment Performed - Cement Squeeze
2004-04-13 Plug Back Performed
2004-04-17 Perforation Treatment Performed - Jet Perforation
2004-04-18 Well Log Performed
2004-04-19 Well Log Performed
2004-06-09 Perforation Treatment Performed - Chemical Squeeze
2017-05-09 Perforation Treatment Performed - Cement Plug
2017-05-09 Perforation Treatment Performed - Cement Squeeze
2017-05-09 Plug Back Performed
2017-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-05-10 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-27 Perforation 1869.00 1870.00 17
2017-05-09 Cement Plug 1650.00 1833.00 0
2017-05-10 Packing Device Capped w/Cement 1616.50 1625.00 0
2004-03-28 Acid Treatment 1869.00 1870.00 0
2004-03-29 Packing Device Capped w/Cement 1855.00 1867.00 0
2004-03-31 Perforation 1842.50 1843.20 17
2004-04-03 Perforation 1626.00 1628.00 17
2004-04-13 Cement Squeeze 1626.00 1628.00 0
2004-04-17 Perforation 1833.00 1835.00 17
2004-06-09 Chemical Squeeze 1833.00 1835.00 0
2017-05-09 Cement Squeeze 1833.00 1843.20 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-01-09 No Incident Encountered 0.00 0.00
2017-05-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References