If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384242216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.286422,"lon":-113.341881,"icon":""}]} |
| Location: 00/16-22-038-24W4/0 | |
| Location Alias: 00/16-22-38-24 W4M | |
| Location Alias 2: 00/16-22-038-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 22 | |
| County/Municipality: Lacombe County | |
| Well Name: ENHANCEENERGY HAYNES 16-22-38-24 | |
| Operator Name: Enhance Energy Inc. | |
| License Number: 0072409 | |
| License Date: 1978-10-13 | |
| License Status: Suspension | |
| Spud Date: 1978-10-21 | |
| Final Drill Date: 1978-10-30 | |
| Well Total Depth: 1890.00 m | |
| Surface Hole Latitude: 52.286422 | |
| Surface Hole Longitude: -113.341881 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1978-10-13 | Obtained License |
| 1978-10-30 | Finished Drilling |
| 1978-10-30 | Well Mode changed to Drilled and Cased |
| 1978-10-31 | Well Log Performed |
| 1978-11-01 | Drill Stem Test Performed |
| 1978-11-02 | Production Casing Operation Performed |
| 1979-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-01-09 | Perforation Treatment Performed - Jet Perforation |
| 1979-03-02 | Well Began Production |
| 1979-03-02 | Well Fluid changed to Crude Oil |
| 1979-03-02 | Well Mode changed to Pumping |
| 1979-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-01-01 | Well Fluid changed to Crude Oil |
| 1980-01-01 | Well Mode changed to Suspended |
| 1993-11-10 | Well Log Performed |
| 1993-11-11 | Perforation Treatment Performed - Cement Squeeze |
| 1993-11-11 | Plug Back Performed |
| 1993-11-12 | Perforation Treatment Performed - Cement Squeeze |
| 1993-11-12 | Perforation Treatment Performed - Jet Perforation |
| 1993-11-12 | Well Log Performed |
| 1996-11-02 | Perforation Treatment Performed - Cement Squeeze |
| 1996-11-02 | Perforation Treatment Performed - Jet Perforation |
| 1996-11-04 | Perforation Treatment Performed - Cement Squeeze |
| 1996-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1999-02-26 | Well Fluid changed to Crude Oil |
| 1999-02-26 | Well Mode changed to Closed |
| 1999-11-26 | Well Fluid changed to Crude Oil |
| 1999-11-26 | Well Mode changed to Suspended |
| 2005-10-31 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-01-09 | Perforation | 1858.50 | 1860.00 | 7 |
| 1993-11-12 | Perforation | 1365.00 | 1366.00 | 14 |
| 1993-11-12 | Cement Squeeze | 1365.00 | 1366.00 | 0 |
| 1996-11-02 | Perforation | 410.00 | 411.00 | 14 |
| 1996-11-02 | Cement Squeeze | 410.00 | 411.00 | 0 |
| 1996-11-04 | Perforation | 289.00 | 290.00 | 14 |
| 1996-11-04 | Cement Squeeze | 289.00 | 290.00 | 0 |
| 1979-01-09 | Acid Treatment | 1858.50 | 1860.00 | 0 |
| 1979-01-09 | Perforation | 1856.50 | 1857.50 | 3 |
| 1979-01-09 | Acid Treatment | 1856.50 | 1857.50 | 0 |
| 1979-01-09 | Perforation | 1862.00 | 1863.00 | 3 |
| 1979-01-09 | Perforation | 1856.50 | 1857.50 | 3 |
| 1979-01-09 | Acid Treatment | 1856.50 | 1857.50 | 0 |
| 1979-07-04 | Acid Treatment | 1856.50 | 1860.00 | 0 |
| 1993-11-11 | Cement Squeeze | 1856.60 | 1857.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1979 | 3369 | 0.0 | 0.0 | 0.0 |
For data sources see[5]