X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384241502000

Well Details

Well ID: 0384241502000
Loading map...
Location: 00/02-15-038-24W4/0
Location Alias: 00/02-15-38-24 W4M
Location Alias 2: 00/02-15-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY HAYNES 2-15-38-24
Operator Name: Enhance Energy Inc.
License Number: 0034653
License Date: 1968-08-19
License Status: Abandoned
Spud Date: 1968-08-19
Final Drill Date: 1968-08-31
Well Total Depth: 1908.40 m
Surface Hole Latitude: 52.262493
Surface Hole Longitude: -113.345942

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-19 Obtained License
1968-08-31 Finished Drilling
1968-08-31 Well Mode changed to Drilled and Cased
1968-09-02 Drill Stem Test Performed
1968-09-03 Drill Stem Test Performed
1968-09-05 Drill Stem Test Performed
1968-09-06 Production Casing Operation Performed
1968-09-11 Perforation Treatment Performed - Jet Perforation
1968-09-12 Perforation Treatment Performed - Acid Wash - No Pressure
1968-09-12 Well Began Production
1968-09-12 Well Fluid changed to Crude Oil
1968-09-12 Well Mode changed to Flowing
1983-08-31 Well Fluid changed to Crude Oil
1983-08-31 Well Mode changed to Suspended
1984-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-28 Well Log Performed
1984-07-29 Perforation Treatment Performed - Jet Perforation
1984-08-15 Well Fluid changed to Crude Oil
1984-08-15 Well Mode changed to Flowing
1984-11-01 Well Fluid changed to Crude Oil
1984-11-01 Well Mode changed to Suspended
1986-08-25 Well Fluid changed to Crude Oil
1986-08-25 Well Mode changed to Flowing
1986-08-26 Well Fluid changed to Crude Oil
1986-08-26 Well Mode changed to Suspended
1992-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-12 Plug Back Performed
1992-09-12 Well Fluid changed to Crude Oil
1992-09-12 Well Log Performed
1992-09-12 Well Mode changed to Abandoned Zone
1992-09-13 Perforation Treatment Performed - Jet Perforation
1992-09-16 Well Log Performed
1998-05-09 Well Log Performed
1998-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-10 Plug Back Performed
1998-05-11 Well Log Performed
1998-05-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-11 Perforation 1863.90 1865.40 13
1968-09-12 Acid Wash 1863.90 1865.40 0
1984-07-26 Acid Treatment 1863.90 1865.40 0
1984-07-29 Perforation 1866.80 1868.00 13
1992-09-12 Packing Device Capped w/Cement 1842.00 1850.00 0
1992-09-13 Perforation 1530.10 1531.90 13
1998-05-10 Packing Device Capped w/Cement 1509.00 1517.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 826 0.0 0.0 0.0
1969 5178 0.0 0.0 0.0
1970 8402 0.0 0.0 0.0
1971 8405 0.0 0.0 0.0
1972 8627 0.0 0.0 0.0
1973 3059 0.0 0.0 0.0
1974 450 0.0 0.0 0.0
1975 192 0.0 0.0 0.0
1976 264 0.0 0.0 0.0
1977 313 0.0 0.0 0.0
1978 264 0.0 0.0 0.0
1979 312 0.0 0.0 0.0
1980 120 0.0 0.0 0.0
1981 24 0.0 0.0 0.0
1982 48 0.0 0.0 0.0
1984 1260 0.0 0.0 0.0
1986 24 0.0 0.0 0.0

For data sources see[5]

References