X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384241103023

Well Details

Well ID: 0384241103023
Loading map...
Location: 02/03-11-038-24W4/3
Location Alias: 02/03-11-38-24 W4M
Location Alias 2: 02/03-11-038-24 W4/03
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 11
County/Municipality: Lacombe County
Well Name: ENHANCEENERGY HAYNES 6-11-38-24
Operator Name: Enhance Energy Inc.
License Number: 0180531
License Date: 1995-09-06
License Status: Suspension
Spud Date: 2000-07-25
Final Drill Date: 2000-08-02
Well Total Depth: 2147.00 m
Surface Hole Latitude: 52.249709
Surface Hole Longitude: -113.327748

For data sources see[1][2]

Well History

Date Event
1995-09-06 Obtained License
2000-07-25 Direction Drilling Operation Performed - Horizontal
2000-08-02 Finished Drilling
2000-08-02 Perforation Treatment Performed - Open-Hole Completion
2000-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-09 Rig Released
2000-08-09 Well Mode changed to Drilled and Cased
2000-08-15 Well Began Production
2000-08-15 Well Fluid changed to Crude Oil
2000-08-15 Well Mode changed to Pumping
2001-04-26 Well Fluid changed to Crude Oil
2001-04-26 Well Mode changed to Suspended
2002-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-06 Perforation Treatment Performed - Jet Perforation
2002-12-06 Plug Back Performed
2002-12-06 Well Fluid changed to Crude Oil
2002-12-06 Well Mode changed to Abandoned Zone
2002-12-07 Perforation Treatment Performed - Cement Squeeze
2002-12-07 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-07-25 1637.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-02 Open Hole/Barefoot Completion 1637.00 2147.00 0
2000-08-07 Acid Treatment 1873.00 1980.00 0
2002-12-06 Packing Device Capped w/Cement 1617.00 1625.00 0
2002-12-06 Perforation 295.00 295.30 72
2002-12-07 Cement Squeeze 295.00 295.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3291 0.0 0.0 0.0
2001 2858 0.0 0.0 0.0

For data sources see[6]

References