X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384240701000

Well Details

Well ID: 0384240701000
Loading map...
Location: 00/01-07-038-24W4/0
Location Alias: 00/01-07-38-24 W4M
Location Alias 2: 00/01-07-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 07
County/Municipality: Lacombe County
Well Name: NAL JOFFRE 1-7-38-24
Operator Name: NAL Resources Limited
License Number: 0055721
License Date: 1975-11-06
License Status: Suspension
Spud Date: 1975-11-08
Final Drill Date: 1975-11-12
Well Total Depth: 1438.70 m
Surface Hole Latitude: 52.248043
Surface Hole Longitude: -113.414530

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-06 Obtained License
1975-11-12 Finished Drilling
1975-11-12 Well Mode changed to Drilled and Cased
1975-11-13 Drill Stem Test Performed
1975-11-14 Production Casing Operation Performed
1976-03-11 Perforation Treatment Performed - Jet Perforation
1976-03-18 Well Began Production
1976-03-18 Well Fluid changed to Crude Oil
1976-03-18 Well Mode changed to Pumping
1994-01-31 Perforation Treatment Performed - Jet Perforation
1996-10-10 Well Fluid changed to Crude Oil
1996-10-10 Well Mode changed to Closed
1996-10-21 Well Fluid changed to Crude Oil
1996-10-21 Well Mode changed to Pumping
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Closed
2000-01-18 Well Fluid changed to Crude Oil
2000-01-18 Well Mode changed to Pumping
2000-02-01 Well Fluid changed to Crude Oil
2000-02-01 Well Mode changed to Suspended
2011-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-22 Well Log Performed
2012-01-14 Perforation Treatment Performed - Jet Perforation
2012-01-14 Well Log Performed
2012-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-16 Perforation Treatment Performed - Remedial Casing
2012-01-17 Perforation Treatment Performed - Jet Perforation
2012-01-17 Well Log Performed
2012-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-19 Perforation Treatment Performed - Remedial Casing
2012-01-20 Perforation Treatment Performed - Jet Perforation
2012-01-20 Well Log Performed
2012-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-21 Perforation Treatment Performed - Cement Plug
2012-01-21 Perforation Treatment Performed - Remedial Casing
2012-01-22 Perforation Treatment Performed - Jet Perforation
2012-01-22 Well Log Performed
2012-01-23 Perforation Treatment Performed - Cement Plug
2012-01-23 Perforation Treatment Performed - Remedial Casing
2012-01-27 Perforation Treatment Performed - Jet Perforation
2012-01-27 Well Log Performed
2012-01-30 Perforation Treatment Performed - Cement Plug
2012-01-30 Perforation Treatment Performed - Remedial Casing
2012-01-31 Perforation Treatment Performed - Jet Perforation
2012-02-01 Perforation Treatment Performed - Cement Plug
2012-02-01 Perforation Treatment Performed - Remedial Casing
2012-02-04 Perforation Treatment Performed - Cement Plug
2012-02-04 Perforation Treatment Performed - Jet Perforation
2012-02-04 Perforation Treatment Performed - Remedial Casing
2012-02-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-11 Perforation 1412.10 1413.70 7
2012-01-19 Packing Device Capped w/Cement 980.00 996.00 0
2012-01-20 Perforation 817.00 822.00 13
2012-01-20 Perforation 587.00 592.00 13
2012-01-21 Remedial Casing Cementing 817.00 822.00 0
2012-01-21 Packing Device Capped w/Cement 730.00 816.00 0
2012-01-21 Remedial Casing Cementing 587.00 592.00 0
2012-01-21 Cement Plug 502.20 624.40 0
2012-01-22 Perforation 485.00 490.00 13
2012-01-23 Remedial Casing Cementing 485.00 490.00 0
2012-01-23 Cement Plug 440.00 499.00 0
1976-03-11 Perforation 1414.60 1417.30 7
2012-01-27 Perforation 392.00 397.00 13
2012-01-30 Remedial Casing Cementing 392.00 397.00 0
2012-01-30 Cement Plug 346.00 397.00 0
2012-01-31 Perforation 336.00 341.00 13
2012-02-01 Remedial Casing Cementing 336.00 341.00 0
2012-02-01 Cement Plug 319.20 346.00 0
2012-02-04 Perforation 245.00 250.00 13
2012-02-04 Remedial Casing Cementing 245.00 250.00 0
2012-02-04 Cement Plug 84.50 250.00 0
1994-01-31 Perforation 1410.00 1415.00 13
2011-10-22 Packing Device Capped w/Cement 1392.00 1400.00 0
2012-01-14 Perforation 1280.00 1285.00 13
2012-01-16 Remedial Casing Cementing 1280.00 1285.00 0
2012-01-16 Packing Device Capped w/Cement 1265.00 1279.00 0
2012-01-17 Perforation 997.00 1002.00 13
2012-01-19 Remedial Casing Cementing 997.00 1002.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5768 0.0 0.0 0.0
1977 5493 0.0 0.0 0.0
1978 5604 0.0 0.0 0.0
1979 8062 0.0 0.0 0.0
1980 8225 0.0 0.0 0.0
1981 8421 0.0 0.0 0.0
1982 7949 0.0 0.0 0.0
1983 8335 0.0 0.0 0.0
1984 8139 0.0 0.0 0.0
1985 7777 0.0 0.0 0.0
1986 8263 0.0 0.0 0.0
1987 8481 0.0 0.0 0.0
1988 7970 0.0 0.0 0.0
1989 8198 0.0 0.0 0.0
1990 8321 0.0 0.0 0.0
1991 8526 0.0 0.0 0.0
1992 8391 0.0 0.0 0.0
1993 8489 0.0 0.0 0.0
1994 3119 0.0 0.0 0.0
1996 848 0.0 0.0 0.0
1997 1950 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References