X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384240206000

Well Details

Well ID: 0384240206000
Loading map...
Location: 00/06-02-038-24W4/0
Location Alias: 00/06-02-38-24 W4M
Location Alias 2: 00/06-02-038-24 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 24
Section: 02
County/Municipality: Red Deer County
Well Name: INVERNESS HAYNES 6-2-38-24
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0124017
License Date: 1986-09-25
License Status: Re-Entered
Spud Date: 1986-10-05
Final Drill Date: 1986-10-23
Well Total Depth: 1877.00 m
Surface Hole Latitude: 52.237293
Surface Hole Longitude: -113.326901

For data sources see[1][2]

Well History

Date Event
1986-09-25 Obtained License
1986-10-06 Plug Back Performed
1986-10-10 Surface Casing Operation Performed
1986-10-23 Finished Drilling
1986-10-23 Well Log Performed
1986-10-25 Production Casing Operation Performed
1986-10-26 Rig Released
1986-11-06 Well Log Performed
1987-01-23 Perforation Treatment Performed - Jet Perforation
1987-02-01 Well Mode changed to Drilled and Cased
1988-04-27 Well Began Production
1988-04-27 Well Fluid changed to Gas
1988-04-27 Well Mode changed to Flowing
1991-08-01 Well Fluid changed to Gas
1991-08-01 Well Mode changed to Suspended
1996-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-16 Plug Back Performed
1996-08-16 Well Log Performed
1996-08-17 Well Log Performed
1996-08-18 Perforation Treatment Performed - Jet Perforation
1996-08-18 Perforation Treatment Performed - Remedial Casing
1996-08-18 Well Fluid changed to Gas
1996-08-18 Well Log Performed
1996-08-18 Well Mode changed to Abandoned Zone
1997-06-06 Well Abandoned
1997-06-06 Well Fluid changed to Gas
1997-06-06 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-01-23 Perforation 1502.00 1505.00 14
1996-08-16 Packing Device Capped w/Cement 1482.00 1490.00 0
1996-08-18 Perforation 364.00 365.00 13
1996-08-18 Remedial Casing Cementing 364.00 365.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5011 0.0 0.0 0.0
1989 7808 0.0 0.0 0.0
1990 7481 0.0 0.0 0.0
1991 3422 0.0 0.0 0.0
1993 1 0.0 0.0 0.0

For data sources see[5]

References