X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384201004002

Well Details

Well ID: 0384201004002
Loading map...
Location: 00/04-10-038-20W4/2
Location Alias: 00/04-10-38-20 W4M
Location Alias 2: 00/04-10-038-20 W4/02
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 20
Section: 10
County/Municipality: County of Stettler No. 6
Well Name: BEARSPAW UNIT STETTLER 4-10
Operator Name: Bearspaw Petroleum Ltd.
License Number: B0002698
License Date: 1949-03-14
License Status: Issued
Spud Date: 1949-03-30
Final Drill Date: 1949-05-29
Well Total Depth: 1641.30 m
Surface Hole Latitude: 52.246665
Surface Hole Longitude: -112.787805

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-03-14 Obtained License
1949-05-02 Drill Stem Test Performed
1949-05-03 Drill Stem Test Performed
1949-05-07 Liner Casing Operation Performed
1949-05-17 Drill Stem Test Performed
1949-05-29 Drill Stem Test Performed
1949-05-29 Finished Drilling
1949-05-29 Well Mode changed to Drilled and Cased
1949-06-09 Perforation Treatment Performed - Bullet Perforation
1952-07-28 Perforation Treatment Performed - Bullet Perforation
1952-09-10 Well Began Production
1952-09-10 Well Fluid changed to Crude Oil
1952-09-10 Well Mode changed to Pumping
1970-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-05-30 Perforation Treatment Performed - Cement Squeeze
1970-05-30 Well Fluid changed to Crude Oil
1970-05-30 Well Mode changed to Abandoned Zone
1991-02-04 Perforation Treatment Performed - Cement Squeeze
1991-02-05 Perforation Treatment Performed - Cement Squeeze
1991-02-27 Well Log Performed
1991-03-01 Perforation Treatment Performed - Jet Perforation
1991-03-01 Well Log Performed
1991-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-06-09 Bullet Perforation 1624.60 1627.60 20
1952-07-28 Bullet Perforation 1580.40 1595.60 13
1970-05-30 Acid Treatment 1580.40 1595.60 0
1970-05-30 Cement Squeeze 1580.40 1595.60 0
1991-02-04 Cement Squeeze 1624.60 1627.60 0
1991-02-05 Cement Squeeze 1580.40 1595.60 0
1991-03-01 Perforation 1623.00 1625.00 14
1991-03-19 Acid Treatment 1623.00 1625.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 115 0.0 0.0 0.0
1969 0 0.0 0.0 0.0

For data sources see[5]

References