If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384180302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.231599,"lon":-112.49239,"icon":""}]} |
Location: 00/02-03-038-18W4/0 | |
Location Alias: 00/02-03-38-18 W4M | |
Location Alias 2: 00/02-03-038-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 18 | |
Section: 03 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: RALLYCANADA LEA 2-3-38-18 | |
Operator Name: Rally Canada Resources Ltd. | |
License Number: 0153204 | |
License Date: 1992-07-24 | |
License Status: Suspension | |
Spud Date: 1992-08-01 | |
Final Drill Date: 1992-08-06 | |
Well Total Depth: 1321.00 m | |
Surface Hole Latitude: 52.231599 | |
Surface Hole Longitude: -112.492390 |
Date | Event |
---|---|
1992-07-24 | Obtained License |
1992-08-02 | Surface Casing Operation Performed |
1992-08-06 | Finished Drilling |
1992-08-06 | Well Log Performed |
1992-08-06 | Well Mode changed to Drilled and Cased |
1992-08-07 | Well Log Performed |
1992-08-08 | Production Casing Operation Performed |
1992-08-08 | Rig Released |
1992-08-19 | Well Log Performed |
1992-08-21 | Perforation Treatment Performed - Jet Perforation |
1992-08-21 | Well Log Performed |
1992-08-22 | Well Began Production |
1992-08-22 | Well Fluid changed to Crude Oil |
1992-08-22 | Well Mode changed to Flowing |
1993-08-27 | Perforation Treatment Performed - Jet Perforation |
1993-08-27 | Well Log Performed |
1995-05-02 | Well Fluid changed to Crude Oil |
1995-05-02 | Well Mode changed to Pumping |
1997-09-07 | Perforation Treatment Performed - Jet Perforation |
1997-09-07 | Well Log Performed |
1998-05-15 | Well Log Performed |
1999-12-02 | Well Fluid changed to Crude Oil |
1999-12-02 | Well Mode changed to Suspended |
1999-12-04 | Well Log Performed |
1999-12-09 | Perforation Treatment Performed - Jet Perforation |
1999-12-10 | Perforation Treatment Performed - Jet Perforation |
1999-12-10 | Well Log Performed |
1999-12-11 | Well Log Performed |
2000-03-30 | Perforation Treatment Performed - Jet Perforation |
2000-03-31 | Well Log Performed |
2010-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-28 | Plug Back Performed |
2010-09-28 | Well Fluid changed to Crude Oil |
2010-09-28 | Well Mode changed to Abandoned Zone |
2010-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-29 | Plug Back Performed |
2010-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-30 | Plug Back Performed |
2010-10-01 | Perforation Treatment Performed - Jet Perforation |
2010-10-01 | Well Log Performed |
2010-10-02 | Perforation Treatment Performed - Cement Plug |
2010-10-02 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-08-21 | Perforation | 1274.00 | 1276.00 | 13 |
2000-03-30 | Perforation | 405.00 | 411.00 | 17 |
2010-09-28 | Packing Device Capped w/Cement | 1258.40 | 1266.40 | 0 |
2010-09-29 | Packing Device Capped w/Cement | 572.50 | 580.50 | 0 |
2010-09-29 | Packing Device Capped w/Cement | 533.00 | 541.00 | 0 |
2010-09-30 | Packing Device Capped w/Cement | 393.40 | 401.40 | 0 |
2010-10-01 | Perforation | 373.00 | 375.00 | 17 |
2010-10-02 | Cement Plug | 359.00 | 368.50 | 0 |
2010-10-02 | Remedial Casing Cementing | 373.00 | 375.00 | 0 |
1993-08-27 | Perforation | 1277.00 | 1278.00 | 13 |
1997-09-07 | Perforation | 1274.00 | 1275.00 | 20 |
1997-09-07 | Perforation | 1269.50 | 1273.00 | 20 |
1999-12-09 | Perforation | 589.50 | 595.50 | 20 |
1999-12-09 | Perforation | 596.50 | 601.50 | 20 |
1999-12-10 | Perforation | 549.00 | 553.50 | 20 |
1999-12-10 | Perforation | 553.50 | 559.50 | 20 |
2000-03-30 | Perforation | 411.00 | 417.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 2987 | 0.0 | 0.0 | 0.0 |
1993 | 4906 | 0.0 | 0.0 | 0.0 |
1994 | 4445 | 0.0 | 0.0 | 0.0 |
1995 | 8639 | 0.0 | 0.0 | 0.0 |
1996 | 8642 | 0.0 | 0.0 | 0.0 |
1997 | 8212 | 0.0 | 0.0 | 0.0 |
1998 | 8104 | 0.0 | 0.0 | 0.0 |
1999 | 7729 | 0.0 | 0.0 | 0.0 |
For data sources see[5]