X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384122206020

Well Details

Well ID: 0384122206020
Loading map...
Location: 02/06-22-038-12W4/0
Location Alias: 02/06-22-38-12 W4M
Location Alias 2: 02/06-22-038-12 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 6-22-38-12
Operator Name: Karve Energy Inc.
License Number: 0435441
License Date: 2011-07-25
License Status: Issued
Spud Date: 2011-08-31
Final Drill Date: 2011-09-03
Well Total Depth: 1697.00 m
Surface Hole Latitude: 52.278008
Surface Hole Longitude: -111.649172

For data sources see[1][2]

Well History

Date Event
2011-07-25 Obtained License
2011-08-31 Surface Casing Operation Performed
2011-08-31 Well Log Performed
2011-09-01 Direction Drilling Operation Performed - Horizontal
2011-09-02 Production Casing Operation Performed
2011-09-02 Well Log Performed
2011-09-03 Finished Drilling
2011-09-03 Well Mode changed to Drilled and Cased
2011-09-04 Rig Released
2011-09-14 Well Log Performed
2011-09-23 Well Began Production
2011-09-23 Well Fluid changed to Crude Oil
2011-09-23 Well Mode changed to Flowing
2011-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-28 Perforation Treatment Performed - Chemical Squeeze
2015-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-05-29 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-01 562.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-27 Multi-Stage Fracture 1677.00 1677.10 0
2011-09-27 Multi-Stage Fracture 999.00 999.10 0
2015-05-28 Chemical Squeeze 1677.00 1677.10 0
2015-05-28 Chemical Squeeze 1600.00 1600.10 0
2015-05-28 Chemical Squeeze 1525.00 1525.10 0
2015-05-29 Chemical Squeeze 1427.00 1427.10 0
2015-05-29 Chemical Squeeze 1374.00 1374.10 0
2015-05-29 Chemical Squeeze 1288.00 1288.10 0
2015-05-29 Chemical Squeeze 1201.00 1201.10 0
2015-05-29 Chemical Squeeze 1138.00 1138.10 0
2015-05-29 Chemical Squeeze 1063.00 1063.10 0
2011-09-27 Multi-Stage Fracture 1600.00 1600.10 0
2015-05-29 Chemical Squeeze 999.00 999.10 0
2015-05-29 Acid Treatment 1677.00 1677.10 0
2015-05-29 Acid Treatment 1600.00 1600.10 0
2015-05-29 Acid Treatment 1525.00 1525.10 0
2015-05-29 Acid Treatment 1427.00 1427.10 0
2015-05-29 Acid Treatment 1374.00 1374.10 0
2015-05-29 Acid Treatment 1288.00 1288.10 0
2015-05-29 Acid Treatment 1201.00 1201.10 0
2015-05-29 Acid Treatment 1138.00 1138.10 0
2015-05-29 Acid Treatment 1063.00 1063.10 0
2011-09-27 Multi-Stage Fracture 1525.00 1525.10 0
2015-05-29 Acid Treatment 999.00 999.10 0
2011-09-27 Multi-Stage Fracture 1427.00 1427.10 0
2011-09-27 Multi-Stage Fracture 1374.00 1374.10 0
2011-09-27 Multi-Stage Fracture 1288.00 1288.10 0
2011-09-27 Multi-Stage Fracture 1201.00 1201.10 0
2011-09-27 Multi-Stage Fracture 1138.00 1138.10 0
2011-09-27 Multi-Stage Fracture 1063.00 1063.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1843 0.0 0.0 0.0
2012 8363 0.0 0.0 0.0
2013 8651 0.0 0.0 0.0
2014 8481 0.0 0.0 0.0
2015 7570 0.0 0.0 0.0
2016 8556 0.0 0.0 0.0
2017 8532 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8479 0.0 0.0 0.0
2020 2038 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References