If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384051906B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.278322,"lon":-110.711353,"icon":""}]} |
Location: B0/06-19-038-05W4/0 | |
Location Alias: B0/06-19-38-05 W4M | |
Location Alias 2: B0/06-19-038-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ENI PROVOST 6B-19-38-5 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0148917 | |
License Date: 1991-05-21 | |
License Status: RecCertified | |
Spud Date: 1991-06-17 | |
Final Drill Date: 1991-06-19 | |
Well Total Depth: 901.00 m | |
Surface Hole Latitude: 52.278322 | |
Surface Hole Longitude: -110.711353 |
Date | Event |
---|---|
1991-05-21 | Obtained License |
1991-06-17 | Surface Casing Operation Performed |
1991-06-19 | Finished Drilling |
1991-06-19 | Production Casing Operation Performed |
1991-06-19 | Well Log Performed |
1991-06-19 | Well Mode changed to Drilled and Cased |
1991-06-20 | Rig Released |
1991-06-22 | Perforation Treatment Performed - Jet Perforation |
1991-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-23 | Perforation Treatment Performed - Jet Perforation |
1991-06-23 | Plug Back Performed |
1991-07-27 | Well Began Production |
1991-07-27 | Well Fluid changed to Crude Oil |
1991-07-27 | Well Mode changed to Pumping |
1993-09-30 | Well Fluid changed to Crude Oil |
1993-09-30 | Well Mode changed to Suspended |
1995-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-06 | Plug Back Performed |
1995-01-06 | Well Abandoned |
1995-01-06 | Well Fluid changed to Crude Oil |
1995-01-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-06-22 | Perforation | 853.00 | 855.00 | 13 |
1991-06-23 | Packing Device Capped w/Cement | 849.00 | 852.00 | 0 |
1991-06-23 | Perforation | 842.50 | 843.50 | 13 |
1995-01-06 | Packing Device Capped w/Cement | 830.00 | 838.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 3757 | 0.0 | 0.0 | 0.0 |
1992 | 8556 | 0.0 | 0.0 | 0.0 |
1993 | 5500 | 0.0 | 0.0 | 0.0 |
For data sources see[5]