X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384051904C00

Well Details

Well ID: 0384051904C00
Loading map...
Location: C0/04-19-038-05W4/0
Location Alias: C0/04-19-38-05 W4M
Location Alias 2: C0/04-19-038-05 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 05
Section: 19
County/Municipality: Municipal District of Provost No. 52
Well Name: SEQUOIA 1C0 PROVO 4-19-38-5
Operator Name: Surge Energy Inc.
License Number: 0150255
License Date: 1991-10-04
License Status: Abandoned
Spud Date: 1991-10-11
Final Drill Date: 1991-10-13
Well Total Depth: 904.00 m
Surface Hole Latitude: 52.275944
Surface Hole Longitude: -110.717074

For data sources see[1][2]

Well History

Date Event
1991-10-04 Obtained License
1991-10-11 Surface Casing Operation Performed
1991-10-13 Finished Drilling
1991-10-13 Well Log Performed
1991-10-13 Well Mode changed to Drilled and Cased
1991-10-14 Production Casing Operation Performed
1991-10-14 Rig Released
1991-10-20 Perforation Treatment Performed - Jet Perforation
1991-10-21 Perforation Treatment Performed - Jet Perforation
1991-10-22 Perforation Treatment Performed - Cement Squeeze
1991-10-23 Perforation Treatment Performed - Jet Perforation
1991-10-24 Perforation Treatment Performed - Jet Perforation
1991-11-01 Well Began Production
1991-11-01 Well Fluid changed to Crude Oil
1991-11-01 Well Mode changed to Pumping
1993-08-31 Well Fluid changed to Crude Oil
1993-08-31 Well Mode changed to Suspended
2008-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-05-28 Plug Back Performed
2008-05-28 Well Fluid changed to Crude Oil
2008-05-28 Well Mode changed to Abandoned Zone
2008-05-29 Well Abandoned
2008-05-29 Well Fluid changed to Crude Oil
2008-05-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-10-20 Perforation 859.00 863.00 13
1991-10-21 Perforation 864.00 865.00 13
1991-10-22 Cement Squeeze 859.00 865.00 0
1991-10-23 Perforation 859.00 863.00 13
1991-10-24 Perforation 862.00 863.00 13
2008-05-28 Packing Device Capped w/Cement 844.00 852.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1430 0.0 0.0 0.0
1992 5900 0.0 0.0 0.0

For data sources see[5]

References