X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384041309C00

Well Details

Well ID: 0384041309C00
Loading map...
Location: C0/09-13-038-04W4/0
Location Alias: C0/09-13-38-04 W4M
Location Alias 2: C0/09-13-038-04 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 04
Section: 13
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1C0 PROVOST 9-13-38-4
Operator Name: West Lake Energy Corp.
License Number: 0129791
License Date: 1987-11-02
License Status: Issued
Spud Date: 1987-11-20
Final Drill Date: 1987-11-23
Well Total Depth: 870.00 m
Surface Hole Latitude: 52.269947
Surface Hole Longitude: -110.438818

For data sources see[1][2]

Well History

Date Event
1987-11-02 Obtained License
1987-11-21 Surface Casing Operation Performed
1987-11-23 Finished Drilling
1987-11-23 Well Log Performed
1987-11-23 Well Mode changed to Drilled and Cased
1987-11-24 Rig Released
1987-11-29 Perforation Treatment Performed - Jet Perforation
1987-11-29 Production Casing Operation Performed
1987-11-30 Perforation Treatment Performed - Jet Perforation
1987-12-02 Well Began Production
1987-12-02 Well Fluid changed to Crude Oil
1987-12-02 Well Mode changed to Pumping
1993-02-01 Perforation Treatment Performed - Jet Perforation
1997-09-02 Well Fluid changed to Crude Oil
1997-09-02 Well Mode changed to Abandoned Zone
1997-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-29 Perforation Treatment Performed - Jet Perforation
1997-09-29 Plug Back Performed
1997-09-30 Perforation Treatment Performed - Jet Perforation
1997-10-02 Perforation Treatment Performed - Fractured
1997-10-05 Well Log Performed
1997-10-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-29 Perforation 839.00 840.00 13
1987-11-30 Perforation 839.00 842.00 13
1993-02-01 Perforation 823.00 825.50 13
1997-09-29 Packing Device Capped w/Cement 830.00 838.00 0
1997-09-29 Packing Device Capped w/Cement 816.00 822.00 0
1997-09-29 Perforation 800.50 804.00 13
1997-09-30 Perforation 804.00 809.00 13
1997-10-02 Fracture 800.50 809.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 668 0.0 0.0 0.0
1988 8575 0.0 0.0 0.0
1989 8532 0.0 0.0 0.0
1990 8665 0.0 0.0 0.0
1991 8427 0.0 0.0 0.0
1992 8549 0.0 0.0 0.0
1993 7398 0.0 0.0 0.0
1994 8468 0.0 0.0 0.0
1995 8756 0.0 0.0 0.0
1996 8773 0.0 0.0 0.0
1997 6524 0.0 0.0 0.0

For data sources see[5]

References