If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0384032504002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/04-25-038-03W4/2 | |
| Location Alias: 00/04-25-38-03 W4M | |
| Location Alias 2: 00/04-25-038-03 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 038 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 25 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: SURGE ENERGY PROVOST 4-25-38-3 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0090909 | |
| License Date: 1981-06-24 | |
| License Status: Suspension | |
| Spud Date: 1981-06-25 | |
| Final Drill Date: 1981-06-27 | |
| Well Total Depth: 846.00 m | |
| Surface Hole Latitude: 52.290620 | |
| Surface Hole Longitude: -110.311211 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1981-06-24 | Obtained License |
| 1981-06-27 | Finished Drilling |
| 1981-06-27 | Well Log Performed |
| 1981-06-27 | Well Mode changed to Drilled and Cased |
| 1981-06-28 | Drill Stem Test Performed |
| 1981-06-29 | Production Casing Operation Performed |
| 1981-07-07 | Perforation Treatment Performed - Jet Perforation |
| 1981-07-08 | Perforation Treatment Performed - Cement Squeeze |
| 1981-07-09 | Perforation Treatment Performed - Jet Perforation |
| 1981-07-10 | Perforation Treatment Performed - Fractured |
| 1981-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1981-07-15 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-25 | Well Began Production |
| 2005-10-25 | Well Fluid changed to Gas |
| 2005-10-25 | Well Mode changed to Flowing |
| 2010-08-24 | Well Fluid changed to Gas |
| 2010-08-24 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-07-07 | Perforation | 776.50 | 777.60 | 14 |
| 1981-07-08 | Cement Squeeze | 776.50 | 777.60 | 0 |
| 1981-07-09 | Perforation | 763.00 | 766.50 | 14 |
| 1981-07-10 | Fracture | 763.00 | 766.50 | 0 |
| 1981-07-15 | Packing Device Capped w/Cement | 757.50 | 757.50 | 0 |
| 1981-07-15 | Perforation | 697.50 | 700.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 1608 | 0.0 | 0.0 | 0.0 |
| 2006 | 8549 | 0.0 | 0.0 | 0.0 |
| 2007 | 5783 | 0.0 | 0.0 | 0.0 |
For data sources see[5]