X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030505C00

Well Details

Well ID: 0384030505C00
Loading map...
Location: C0/05-05-038-03W4/0
Location Alias: C0/05-05-38-03 W4M
Location Alias 2: C0/05-05-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1C0 PROVOST 5-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0146264
License Date: 1990-11-09
License Status: Abandoned
Spud Date: 1990-11-15
Final Drill Date: 1990-11-17
Well Total Depth: 895.00 m
Surface Hole Latitude: 52.234918
Surface Hole Longitude: -110.408251

For data sources see[1][2]

Well History

Date Event
1990-11-09 Obtained License
1990-11-15 Surface Casing Operation Performed
1990-11-16 Direction Drilling Operation Performed - Deviate
1990-11-17 Finished Drilling
1990-11-17 Well Mode changed to Drilled and Cased
1990-11-18 Production Casing Operation Performed
1990-11-18 Well Log Performed
1990-11-19 Rig Released
1990-11-22 Well Log Performed
1990-12-05 Well Log Performed
1990-12-09 Perforation Treatment Performed - Jet Perforation
1990-12-09 Well Log Performed
1990-12-29 Well Began Production
1990-12-29 Well Fluid changed to Crude Oil
1990-12-29 Well Mode changed to Pumping
1994-09-06 Well Fluid changed to Crude Oil
1994-09-06 Well Mode changed to Suspended
1997-04-12 Perforation Treatment Performed - Jet Perforation
1997-04-12 Well Log Performed
1997-04-13 Well Fluid changed to Crude Oil
1997-04-13 Well Mode changed to Pumping
1997-04-30 Well Fluid changed to Crude Oil
1997-04-30 Well Mode changed to Suspended
1997-09-06 Perforation Treatment Performed - Fractured
1997-09-06 Perforation Treatment Performed - Jet Perforation
1997-09-06 Well Log Performed
1997-09-10 Well Fluid changed to Crude Oil
1997-09-10 Well Mode changed to Suspended
1998-03-30 Perforation Treatment Performed - Cement Squeeze
1998-04-01 Perforation Treatment Performed - Fractured
2018-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-06-29 Plug Back Performed
2018-06-29 Well Fluid changed to Crude Oil
2018-06-29 Well Mode changed to Abandoned Zone
2018-08-17 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-11-16 380.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-09 Perforation 859.00 861.20 13
1997-04-12 Perforation 860.00 864.00 18
1997-09-06 Perforation 823.00 829.00 18
1997-09-06 Fracture 823.00 827.00 0
1997-09-06 Fracture 824.00 828.00 0
1998-03-30 Cement Squeeze 859.00 864.00 0
1998-04-01 Fracture 823.00 829.00 0
2018-06-29 Packing Device Capped w/Cement 803.00 811.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 24 0.0 0.0 0.0
1991 6787 0.0 0.0 0.0
1992 8394 0.0 0.0 0.0
1993 7146 0.0 0.0 0.0
1994 338 0.0 0.0 0.0
1997 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-04-01 No Incident Encountered 0.00 0.00
2012-11-27 No Incident Encountered 0.00 0.00
2018-06-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References